SARM on Going Project :

  1. Consultancy Services for Detailed Structural Design of Seventy-Five Bridges of more than 100m in Length under Different Locations in Eight Divisions, under Feasibility Study for Important Bridge Construction on Rural Roads Project (2nd Phase). (Package No.: FS/24-25/BSD-1). 2025 , Client -LGED.
  2. Consultancy Services for Preparation of Master Plan (Structural Plan, Urban Area Plan, Detail Area Plan) for Extended of Sylhet City Corporation. 2025
  3. Providing Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision of Construction Works for Widening the Barayerhat- Heanko- Ramgarh Road (R-151 & R-152) under Chattogram Road Division.
  4. Consulting Services for Railway Connectivity Improvement Preparatory Facility Project [Package No. CS3 (RCIPFSD1)]
  5. Prepare Detail Design, Drawing & Construction Supervision including other Incidental Works for Construction of 4 nos. Flyover at different Railway crossing under the project ‘Integrated Urban Infrastructure Development in Rajshahi City’ Package No. SW-02 (Lot-B).  
  6. Consultancy Services for Detailed Design, Tender Assistance and Project Implementation of Construction of Nalua-Baherchar Bridge over the river Pandab-Paira at 27th km of Barishal (Dinerarpool)-Laxmipasha-Dumki Road (Z-8044)
  7. Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17-1
  8. Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 18-1
  9. Program for Supporting Rural Bridges (SurRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 26-1
  10. Prepare Detail Design, Drawing & Construction Supervision including other incidental works for Construction of Integrated Flyover at Bornali, Bondho Gate and New Bilsimla Railway Crossing along recently completed 4 lane Road under the project Integrated Urban Infrastructure Development in Rajshahi City (Lot-C).   
  11. Consultancy Services for Road Construction Work from Gate No 3 to Weigh Bridge at CDDL, East Patenga, Chattogram. Chattogram Dry Dock Ltd, Bangldesh Navy.

SARM Project List

Sl. No.

Project Name

Month of Year

Client/Funding

1.         

Tubewell Project

August-1970

EPADC

2.         

Upper Kushiyara Project

September 1973

BWDB

3.         

Khulna Mongla Road

October- 1977

RHD

4.         

Chittagong Second Water Supply Project

April 1981

Chittagong WASA

5.         

Khulna Mongla Road

March 1982

RHD

6.         

South-West Rural Development Project (RWP-component)

December 1982

Ministry of  Local Government  Rural Development and Co-operatives

7.         

Bridge Culvert in Dhaka Division

January 1983

Ministry of Food

8.         

Supervision of strengthening of pavement work of Feni By-pass Road

January 1983

RHD

9.         

Land use Plans/Master Plan of Keshabpur, Monirampur Sharsa,jhikagacha and abhonagar upzilla Head quarters, Jessore.

April 1984

Ministrya of Urban development Directorate

10.      

First Highway

January 1984

RHD

11.      

Engineering  & Soco- Economic Survey 100-Thana Intensive Rural works programmed (phase -lll) (Jamalpur District, Group Vll)

 

June 1984

Ministry of  Local Government  Rural Development and Co-operatives

12.      

Rupali Bank Complex at Khulna, Chittagong & Rangpur.

August 1984

Rupali Bank

Road Sector

Sl. No.

Project Name

Client/

Fund

Period of Execution

Total value of the services (Contract Value)

Project Length & Carriageway width

1.         

Project Implementation Consulting services (Construction Supervision, Procurement Assistance) for Improvement of Cumilla (Mainamati)-Brahmanbaria (Dharkhar) National Highway as 4-Lane National Highway Project. (Package No.: GDP-04)

RHD

Start Date:

June 2024

 

Design Phase Completion Date:

December 2024

 

BDT

TK 4,103.90 Lacs

Length: 54.00 km.

04 Lane

 

Funding By

GOB/Exim Bank

2.         

Consulting services for Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-lane Highway and Construction of Service lanes on both sides.

RHD

Start Date:

July 2019

 

Completion Date:

June 2020

Tk. 309.36 Lacs

Length: 56.2 km.

3.         

Providing Consulting services for Review of Pavement, Bridge, Culvert Design and Supervision of Construction works for widening the Barayerhat-Heanko-Ramgarh Road (R-151 & R-152) under Chattogram Road Division.

RHD

Start Date:

August 2021

 

Completion Date:

Ongoing

Tk. 11,46.37 Lacs

Length: 38.00 km.

4.         

Consulting services for “Carrying Out Classified Traffic Count Survey of RDH Road Network of Dhaka, Mymensingh and Sylhet Zone (Package No-HDM/2018-19/SR-1).”

RHD

24/01/2019

23/05/2019

Tk. 96.60 Lacs

Classified Traffic Count Survey at 320 stations of Dhaka, Mymensingh and Sylhet Zones

5.         

Consulting services for “Carrying out Classified Traffic Count Survey of RHD Road Network of Rajshahi and Rangpur Zone (Package No-HDM/2018-19/SR-3).”

RHD

24/01/2019

23/05/2019

Tk. 94.56 Lacs

Classified Traffic Count Survey at 290 stations of Rajshahi and Rangpur Zones

6.         

Road Safety Audit of Joydebpur-Mymensinghh (N3), Kanchpur-Daudkandi and Chittagong-Cox’s Bazar (N1), Kashinathpur-Rajshahi (N6) and Dhaka-Aricha (N5) (Total 500 Kilometer) National Highway during the Fiscal Year 2017-2018.

RHD

Start Date:

April 2018

 

Completion Date: June 2018

Tk. 74.99 Lacs

Road Safety Audit of Total 500 km National Highway during the Fiscal Year 2017-2018.

7.         

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project.

Bangladesh Army

Start Date: 

April 2014

Completion Date:

Mar. 2017

Tk. 189.00 Lacs

Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices.

8.         

Consulting services for Construction Supervision and Project Management of Rajapara-Payra Port Connecting Road.

Payra Port Authority

Start Date:

March 2017

 

Completion Date: April 2019

Tk. 448.00 Lac.

Length 5.01 Km

 

9.         

Consulting services for Construction Supervision of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women) under Chittagong Development Authority.

Phase – I : Design Phase

Phase – II : Construction Supervision Phase

CDA

Phase – I

Start Date: 01/06/2015

Completion Date: May 2024

Tk. 339.15 Lacs

Length 6.00 Km

Width 14.60m

10.      

Consulting services for Detailed Digital Survey and Feasibility Study including IEE (Initial Environmental Examination) and EIA (Environmental Impact Assessment) of the proposed Project “Construction of Road, Bridge and Culver from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B & widening of Major Road 5)

RAJUK

Start Date:

November 2017

 

Completion Date: March 2018

Tk. 57.38 Lacs

Length

·         3.89 km

·         5.21 km and

6.15 km

11.      

Feasibility Study for the Project “Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road and Kapasia Bazar to Sucharan Mor.”

RDA

Start Date:

March 2017

 

Completion Date: April 2017

Tk. 3.50 Lacs

Length 1.10 km

Width 18.28m (60feet).

and

Length 2.35 km Width 24.38m (80ft).

12.      

Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road [21 km (approx.) of the R203 road.] and Bridges & Culverts under Brahmanbaria Road Division.

RHD

Start Date:

August 2015

 

Completion Date: March 2016

Tk. 4.505 Million

Length 19.350 Km

Width 7.30m

13.      

Consulting services for Strengthen of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong.

Phase – I : Design Phase

CDA

Phase – I

Start Date:25/11/2010

 

Completion Date:24/02/2012

230.00 Lacs

Length 6.00 Km

Width 14.60m

14.      

Consulting services for Detailed Design and Construction Supervision of Sylhet-Tamabil-Jafflong Road Improvement Project.

RHD

Start Date: 8/2/1998

 

Completion Date: 30/4/2002

1.402 Million

Length 61Km

Width 7.30m

15.      

IDA financed Construction Supervision for Rehabilitation of Dhaka-Sylhet Road Project

RHD

Start Date: 14/5/1999

 

Completion Date: 30/12/2004

5.90 Million

Length 223.5 Km

Width 7.30m

16.      

Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Construction of Andkoy – Aquina Road

 MPW

Start Date:

July 2007

Completion Date:

April 2013

USD 1.24 million

(BDT 104.16 million)

Length 32 Km

Width 7.00m

17.      

Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Rehabilitation of Doshi-Pol-E Khumri existing Road,

 MPW

Start Date:

Jul 2007

Completion Date:

October 2014

USD 1.411 million

(BDT 118.524 million)

Length 51 Km

Width 7 & 14 meter

18.      

Design Review, Supervision Consultancy Service of Jabul Saraj-Nijrab Road Projec

 MPW

Start Date:

November 2010

Completion Date:

July 2018

USD 2.184 million

(BDT 183.456 million)

Length 50 Km

Width 7.0 m

19.      

Design review, Supervision Consultancy for construction supervision of Fayzabad – Eshkashim (43 km) (Fayzabad-Beharak) Road Project.

 MPW

Start Date:

Mar 2012

Completion Date:

July 2018

USD 4.144 million

(BDT 348.096 million)

Length 43 Km

Width 7.0 m

20.      

Khulna By-pass Road under Rupsa Bridge Construction Project

RHD

Start Date: 17/6/2001

 

Completion Date:30/3/2006

US$ 16.80 Million, (Tk. 100.80 crores)

Length 17 Km

Width 7.30m

21.      

Consulting services for Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement Project. (Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road).

RHD

Start Date: 24/6/2002

 

Completion Date:30/7/2005

0.49  Million 

Length 14.89Km

Width 7.30m

22.      

Construction of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road)

 RAJUK

Start Date:

March, 2009

 

Completion Date: June 2011

Tk. 184 Lacs  (US$ 0.27  Million )

Length 7.0 Km

Width 30 m

23.      

Design, Supervision & Monitoring of Madani Avenue Road Project (form Progoti Sarani Intersection to Balu River)

 

Phase – I : Design Phase

Phase – II : Construction Supervision Phase

RAJUK

Start Date: 5/6/2011

 

Completion Date: 30/12/2013

133.00 Lacs

Length 6.18 Km

Width 21.6& 7.30m

24.      

Road Condition Assessment Works of RHD Road Network during the year 2012-2013 (East Zone of Bangladesh)

RHD

Start Date:

May 2013

 

Completion Date: September 2013

Tk. 354 Lacs

Road Condition Assessment Works on RHD road networks of about 10800 Km Road.

25.      

Road Condition Assessment Works of RHD Road Network during the year 2012-2013 (West Zone of Bangladesh)

RHD

05/2013

09/2013

Tk. 340 Lacs

Road Condition Assessment Works on RHD road networks of about 10600 Km Road.

26.      

Road Condition Assessment Works of RHD Road Network during the year 2009-2010

RHD

04/2010

08/2010

USD 0.13 million

Road Condition Assessment Works on RHD road networks of about 7,420 Km Road.

27.      

Road Condition Assessment Works of RHD Road Network during the year 2008-2009 (Package-2)

RHD

04/2009

07/2009

USD 0.27 million

Road Condition Assessment Works on RHD road networks of about 9,137 Km Road

28.      

Road Condition Assessment Works of RHD Road Network during the year 2007-2008

RHD

12/2007

06/2008

USD 0.27 million

Road Condition Assessment Works on RHD road networks of about 14,427 Km Road

29.      

Road Condition Assessment Works of RHD Road Network (Package 01)

RHD

06/2004

12/2004

USD 0.43 million

All over the country.

30.      

NDF funded Road Safety Measures on National Regional Roads

RHD

02/1998 to 2002

Tk. 412.147 Lacs

 

31.      

DANIDA Financed Dhaka Aricha Highway Rehabilitation Project (Design, Tendering & Construction Supervision)

RHD

May 1993

March 1999

US$ 0.38 Million

 

32.      

Road Rehabilitation and Maintenance Project. (NW) (RRMP) (Funded By IDA), Package 1 & 2

RHD

February , 1988

March 1995

 

US$ 4,574,299

BDT 875,86,400

 

33.      

Supervision of Strengthening of Pavement Work of Feni Bypass Road. (IDA Credit No. 1301-BD)

RHD

November 23, 1983

November, 1985

 

Tk. 4,094,750

 

 

Bridge Sector

Sl. No.

Name of Project

Client/ Fund

Period of Execution

Total value of the services (Contract Value)

Size & Type

1.         

Consultancy Services for Detailed Structural Design of Seventy-Five Bridges of more than 100m in Length under Different Locations in Eight Divisions, under Feasibility Study for Important Bridge Construction on Rural Roads Project (2nd Phase). (Package No.: FS/24-25/BSD-1).

LGED

Start Date: 

June 2025

 

Completion Date:

Ongoing

Tk.  3,98,10,000.00

The 75 bridge sites are located in 8 Divisions, 22 Districts and 44 Upazilas in the northeast, far and near northwest, southwest and central southeast regions.

2.         

Program for Supporting Rural Bridges (SupRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17-1

LGED

Start Date: 

July 2023

 

Completion Date:

Ongoing

Tk. 154.05 Lacs

The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges

3.         

Program for Supporting Rural Bridges (SupRB): Consultant for Region (Survey & Supervision Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 18-1

LGED

Start Date: 

July 2023

 

Completion Date:

Ongoing

Tk. 129.36 Lacs

The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges

4.         

Program for Supporting Rural Bridges (SupRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 26-1

LGED

Start Date: 

July 2023

 

Completion Date:

Ongoing

Tk. 344.29 Lacs.

The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges

5.         

Consultancy Services for Detailed Design, Tender Assistance and Project Implementation of Construction of Nalua-Baherchar Bridge over the river Pandab-Paira at 27th km of Barishal (Dinerarpool)-Laxmipasha-Dumki Road (Z-8044).

RHD

Start Date:

June 2023

 

Completion Date: Ongoing

BDT 7,274.60 Lacs

 

US$ 6.705 Million

Length of Bridge: 1300.00M

Detailed Design, Tender Assistance and Project Implementation

6.         

Consultancy Services for Bridge/Culvert Inspection and Data Entry Operation with the Help of Existing Manuals and BMS Software under Barisal Zone and Khulna Zone of Roads and Highways Department (Proposal Package No: SPDC/S/04/2021-2022)

RHD

Start Date:

October 2023

 

Completion Date:

Ongoing

BDT 107180000.00

approximately 1125nos. bridges and 4955nos. Culverts.

7.         

Construction Supervision of Construction of Sonahat Bridge over the River Dudhkumar at Bhurungamari – Sonahat Landport Mothergonj-Bhitorbondh-Nageshwari Road.

RHD

Start Date:

September 2019

 

Completion Date: September 2023

 

Tk. 362.75 Lacs

The Project Covering (i) 645.015m PC Girder Bridge including 2.32 km approach Road and an office building cum inspection banglow.

8.         

Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17

LGED

Start Date:

October 2019

 

Completion Date:

March 2023

Tk. 286.47 Lacs.

The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges

9.         

Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Mymensinghh Division). Proposal Package No: SupRB/2018-19/SD 18

LGED

Start Date:

August 2019

 

Completion Date:

July 2023

Tk. 255.62 Lacs

The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges

10.      

Program for Supporting Rural Bridges (SurRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensinghh Division). Proposal Package No: SupRB/2018-19/SD 26

LGED

Start Date:

October 2019

 

Completion Date:

November 2022

Tk. 544.72 Lacs.

The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges

11.      

Design Review, Tender Documentation and Construction Supervision for Construction of Shitalakhya Bridge (1234.50m) Project (3rd Shitalakhya Bridge Construction Project at Bandar Upazilla, Narayanganj), And 72 Km Road, Bangladesh (Saudi Development Fund)

RHD

Contract Date:

February 2014

Start Date:

March 2014

Completion Date:

July 2023

Tk. 2.2 million

1234.50m (Box Girder Bridge)

12.      

Construction of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women).

Construction Supervision Phase

CDA

Start Date:

June 2015

Completion Date:

May 2017

Tk. 376.337 Lacs

Length:

(30X 5) m (PSC)

(40X 1) m (PSC)

(24X 1) m (RCC)

(425.55X 1) m (PSC)

13.      

Consulting services for Strengthen of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong.

CDA

Start Date:

25/11/2010

Completion Date:

24/02/2012

Tk 230.00 Lacs

Length:

(42X 2) m (PSC)

(12X 1) m (RCC)

(22X 1) m (RCC)

(20X 1) m (RCC)

14.      

Techno Economic Feasibility Study, Digital Topographical Survey, Sub-soil Investigation, Detailed Engineering Design, Cost Estimate and Bill of Quantities (BOQ) for Construction of RCC Bridge on Achintapur UP H/Q – Bhalukapur Bazar Road (Road ID 361233025) at Chainage 3800m over Jalburunga River under Gouripur Upazila, Dist.-Mymensinghh.

LGED

Start Date:

06-Mar-2017

 

Completion Date:

05-Apr-2017

Tk. 2.35 Million

Length: 120m Long RCC Bridge

15.      

Sub-Soil Investigation & Digital Topographical Survey, Detail Design, Drawing (Draft & Final) and Cost Estimate for 40 (Forty) Bridges with Provision for Hydro-Morphological Study 01 (One) Bridge.

LGED

Contract Date:

February 2016

Start Date:

March 2016

Completion Date:

December 2016

Tk. 3.57 Million

40 number Bridge. Length Varies from 15 m to 75 m

16.      

Preparation of Detail Structural Design, Estimate, Technical specification and Standard Tender Document of 02 (Two) bridges under Manikgonj District.

LGED

Contract Date:

October 2013

Start Date:

October 2013

Completion Date:

December 2013

Tk. 4.499 Million

Length:

 

(315X 1) m (PSC)

9 Spans, Span length 35 m Each)

(297X 1) m (PSC) of 9 Spans, Span length 33 m Each)

17.      

Detailed Structural Design, Estimate, Technical specification and Standard Tender Document of 03 (Three) Bridges under Naogaon & Manikgonj District.

LGED

Contract Date:

March 2013

Start Date:

March 05, 2013

Completion Date:

June 05, 2013

Tk. 53.995 Lac

Length:

 

(217X 1) m (PSC)

7 Spans, Span length 31 m Each)

(125X 1) m (RCC)

5 Span, Span length 25 m Each)

(297X 1) m (PSC)

9 Span, Span length 33 m Each)

18.      

Construction of Two Bridges (560 m each) on Brammaputra River Under Islampur Upazila of Jamalpur District.

LGED

Contract Date:

June 08, 2011

Design Phase:

Start Date: June 2011

Completion Date: August 2011

0.053 Million (Tk. 3.95 Million)

Length:    (560 X 1) m

PC Girder

16 Span, Span length 35 m Each)

(560 X 1) m

PC Girder

16 Span, Span length 35 m Each)

19.      

Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road [21 km (approx.) of the R203 road.] and Bridges & Culverts under Brahmanbaria Road Division.

RHD

Start Date:

August 2015

 

Completion Date: March 2016

Tk. 4.505 Million

Length:

(30X 5) m (PSC)

(40X 1) m (PSC)

(24X 1) m (RCC)

(425.55X 1) m (PSC)

20.      

Economic Analysis of Proposed 05 (Five) nos. Bridges over Different 05 (Five) Rivers on Netrakona District.

LGED

Start Date:

Mar. 12, 2013

 

Completion Date: May 11, 2013

Tk. 13.29 Lac.

Length:

 

224×1 m (PSC)

150×1 m (RCC)

110×1 m (RCC)

125×1 m (RCC)

110×1 m (RCC)

21.      

Economic Analysis of Proposed 04 (Four) nos. bridges over different 04 (Four) rivers on Jamalpur District.

LGED

Start Date:

Feb. 03, 2013

 

Completion Date: Apr. 03, 2013

Tk. 10.52 Lac

210×1 m (RCC)

585×1 m (PSC)

125×1 m (RCC)

90×1 m (RCC)

22.      

Consulting services Feasibility Study and Preliminary Design for a) construction of Bridge at Ferry Location at 70th Km on Labukhali – Dumki – Boga – Dashmina – Golachipa – Amragachi Road (Z8806); (Length: 1600 m) (b) construction of Bridge at Ferry Location at 53rd Km on Barishal – Jhalokhati – Bhandaria – Perojpur Road (R870) over the river Kocha; (Length: 2000 m) and (c) Construction of Bridge at Ferry Location at 8th Km. on Rahmatpur – Babugonj – Muladia – Hizlakok Road (Z8034) under BBA” (Length: 1800 m) under Bangladesh Bridge Authority.

BBA

Start Date

(Month/year): 

June 2011

Completion Date (month/year):

February 2012

Tk. 204.5 Lacs

Length:

1600×1 m (Segmental Box Girder)

2000 x1 m (Segmental Box Girder)

1800 x1 m (Segmental Box Girder)

23.      

Feasibility Study for Construction of Bridge at Ferry Location at 17th Km on Kachua – Betagi – Patuakhali – Lohalia – Kalaya Road (Z8052)

BBA

Start Date

(month/year):

September 2011

Completion Date (month/year):

March 2012

Tk. 98.65 Lacs

Length:

1750×1 m (Segmental Box Girder)

24.      

Sylhet-Tamabil-Jaflong Road Improvement Project. [Hazrat Shah Paran (2nd Surma) Bridge & Other Drainage Structures]

RHD

Start Date: July 2002

Completion Date: January 2006

0.45 Million

Length:    392 m

PC Girder

25.      

Design, Supervision & Monitoring of Madani Avenue Road Project (form Progoti Sarani Intersection to Balu River)

 

Phase – I: Design Phase

Phase – II: Construction Supervision Phase

RAJUK

Contract Date:

June 05, 2011

Phase – I

Start Date: 5/6/2011

Completion Date:

30/1/2012

Phase – II

Start Date: 1/3/2012

Completion Date:

March 2014

133.00 Lacs

Length:    (30 X 2) m

(90 X 1) m

(60 X 1) m

PC Girder

26.      

Detail Design, Supervision and Monitoring for the Construction of Roads, Bridges / Culverts of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road)

RAJUK

Contract Date:

March 12, 2009

Start Date:

March 2009

Completion Date:

September 2013

Tk. 184 Lacs  (US$ 0.27  Million )

Approximately length 40 to 50m each

27.      

Detailed Design and Construction Supervision of 7 Nos. of Bridge Construction Work of Purbachal New Town Project.

RAJUK

Contract Date:

November 25, 2009

Start Date:  November 2009

Completion Date:

February, 2011

0.092 Million

7 nos. of Bridges, Approximate length 40 to 50m each

28.      

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project.

BD Army

Start Date: 

April 2014

 

Completion Date:

March 2017

Tk. 189.00 Lacs

Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices.

29.      

IDA financed Rehabilitation of Dhaka-Sylhet Road

RHD

Contract Date:

May 14, 1999

Start Date

June 1999

 

Completion Date

December 2004

5.90 Million

Length: 37 Nos. P.C. Girder Bridges, approximately 1295 m in length

30.      

JBIC funded Supervision of Paksey Bridge Construction Project

RHD

Start Date

June 1998

 

Completion Date

April 2004

5.25 Million

1786m, consisting of 15 spans each 109.5m long, plus two shorter end spans each 71.75 meter long.

31.      

Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Construction of Andkoy – Aquina Road

MPW

Start Date:

Jul 2007

 

Completion Date:

April 2013

USD 1.24 million

(BDT 104.16 million)

Approximate length 40 to 50 m each

32.      

Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Rehabilitation of Doshi-Pol-E Khumri existing Road,

MPW

Start Date:

Jul 2007

 

Completion Date:

October 2014

USD 1.411 million

(BDT 118.524 million)

Approximate length 40 to 50 m each

33.      

Supervision Consultancy Service of Jabul Saraj-Nijrab Road Project MPW/869/ ABD/QCBS

MPW

Start Date:

November 2010

 

Completion Date:

July 2018

USD 2.184 million

(BDT 183.456 million)

Approximate length 40 to 50 m each

34.      

Supervision Consultancy for construction supervision of Fayzabad – Eshkashim (43 km) (Fayzabad-Beharak) Road Project PW/870/ BD/QCB

MPW

 

Start Date:

Mar 2012

 

Completion Date:

July 2018

USD 4.144 million

(BDT 348.096 million)

Approximate length 40 to 50 m each

 