SARM on Going Project :
- Consultancy Services for Detailed Structural Design of Seventy-Five Bridges of more than 100m in Length under Different Locations in Eight Divisions, under Feasibility Study for Important Bridge Construction on Rural Roads Project (2nd Phase). (Package No.: FS/24-25/BSD-1). 2025 , Client -LGED.
- Consultancy Services for Preparation of Master Plan (Structural Plan, Urban Area Plan, Detail Area Plan) for Extended of Sylhet City Corporation. 2025
- Providing Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision of Construction Works for Widening the Barayerhat- Heanko- Ramgarh Road (R-151 & R-152) under Chattogram Road Division.
- Consulting Services for Railway Connectivity Improvement Preparatory Facility Project [Package No. CS3 (RCIPFSD1)]
- Prepare Detail Design, Drawing & Construction Supervision including other Incidental Works for Construction of 4 nos. Flyover at different Railway crossing under the project ‘Integrated Urban Infrastructure Development in Rajshahi City’ Package No. SW-02 (Lot-B).
- Consultancy Services for Detailed Design, Tender Assistance and Project Implementation of Construction of Nalua-Baherchar Bridge over the river Pandab-Paira at 27th km of Barishal (Dinerarpool)-Laxmipasha-Dumki Road (Z-8044)
- Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17-1
- Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 18-1
- Program for Supporting Rural Bridges (SurRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 26-1
- Prepare Detail Design, Drawing & Construction Supervision including other incidental works for Construction of Integrated Flyover at Bornali, Bondho Gate and New Bilsimla Railway Crossing along recently completed 4 lane Road under the project Integrated Urban Infrastructure Development in Rajshahi City (Lot-C).
- Consultancy Services for Road Construction Work from Gate No 3 to Weigh Bridge at CDDL, East Patenga, Chattogram. Chattogram Dry Dock Ltd, Bangldesh Navy.
SARM Project List
|
Sl. No. |
Project Name |
Month of Year |
Client/Funding |
|
1. |
Tubewell Project |
August-1970 |
EPADC |
|
2. |
Upper Kushiyara Project |
September 1973 |
BWDB |
|
3. |
Khulna Mongla Road |
October- 1977 |
RHD |
|
4. |
Chittagong Second Water Supply Project |
April 1981 |
Chittagong WASA |
|
5. |
Khulna Mongla Road |
March 1982 |
RHD |
|
6. |
South-West Rural Development Project (RWP-component) |
December 1982 |
Ministry of Local Government Rural Development and Co-operatives |
|
7. |
Bridge Culvert in Dhaka Division |
January 1983 |
Ministry of Food |
|
8. |
Supervision of strengthening of pavement work of Feni By-pass Road |
January 1983 |
RHD |
|
9. |
Land use Plans/Master Plan of Keshabpur, Monirampur Sharsa,jhikagacha and abhonagar upzilla Head quarters, Jessore. |
April 1984 |
Ministrya of Urban development Directorate |
|
10. |
First Highway |
January 1984 |
RHD |
|
11. |
Engineering & Soco- Economic Survey 100-Thana Intensive Rural works programmed (phase -lll) (Jamalpur District, Group Vll)
|
June 1984 |
Ministry of Local Government Rural Development and Co-operatives |
|
12. |
Rupali Bank Complex at Khulna, Chittagong & Rangpur. |
August 1984 |
Rupali Bank |
Road Sector
|
Sl. No. |
Project Name |
Client/ Fund |
Period of Execution |
Total value of the services (Contract Value) |
Project Length & Carriageway width |
|
1. |
Project Implementation Consulting services (Construction Supervision, Procurement Assistance) for Improvement of Cumilla (Mainamati)-Brahmanbaria (Dharkhar) National Highway as 4-Lane National Highway Project. (Package No.: GDP-04) |
RHD |
Start Date: June 2024
Design Phase Completion Date: December 2024
|
BDT TK 4,103.90 Lacs |
Length: 54.00 km. 04 Lane
Funding By GOB/Exim Bank |
|
2. |
Consulting services for Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-lane Highway and Construction of Service lanes on both sides. |
RHD |
Start Date: July 2019
Completion Date: June 2020 |
Tk. 309.36 Lacs |
Length: 56.2 km. |
|
3. |
Providing Consulting services for Review of Pavement, Bridge, Culvert Design and Supervision of Construction works for widening the Barayerhat-Heanko-Ramgarh Road (R-151 & R-152) under Chattogram Road Division. |
RHD |
Start Date: August 2021
Completion Date: Ongoing |
Tk. 11,46.37 Lacs |
Length: 38.00 km. |
|
4. |
Consulting services for “Carrying Out Classified Traffic Count Survey of RDH Road Network of Dhaka, Mymensingh and Sylhet Zone (Package No-HDM/2018-19/SR-1).” |
RHD |
24/01/2019 – 23/05/2019 |
Tk. 96.60 Lacs |
Classified Traffic Count Survey at 320 stations of Dhaka, Mymensingh and Sylhet Zones |
|
5. |
Consulting services for “Carrying out Classified Traffic Count Survey of RHD Road Network of Rajshahi and Rangpur Zone (Package No-HDM/2018-19/SR-3).” |
RHD |
24/01/2019 – 23/05/2019 |
Tk. 94.56 Lacs |
Classified Traffic Count Survey at 290 stations of Rajshahi and Rangpur Zones |
|
6. |
Road Safety Audit of Joydebpur-Mymensinghh (N3), Kanchpur-Daudkandi and Chittagong-Cox’s Bazar (N1), Kashinathpur-Rajshahi (N6) and Dhaka-Aricha (N5) (Total 500 Kilometer) National Highway during the Fiscal Year 2017-2018. |
RHD |
Start Date: April 2018
Completion Date: June 2018 |
Tk. 74.99 Lacs |
Road Safety Audit of Total 500 km National Highway during the Fiscal Year 2017-2018. |
|
7. |
Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. |
Bangladesh Army |
Start Date: April 2014 Completion Date: Mar. 2017 |
Tk. 189.00 Lacs |
Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. |
|
8. |
Consulting services for Construction Supervision and Project Management of Rajapara-Payra Port Connecting Road. |
Payra Port Authority |
Start Date: March 2017
Completion Date: April 2019 |
Tk. 448.00 Lac. |
Length 5.01 Km
|
|
9. |
Consulting services for Construction Supervision of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women) under Chittagong Development Authority. Phase – I : Design Phase Phase – II : Construction Supervision Phase |
CDA |
Phase – I Start Date: 01/06/2015 Completion Date: May 2024 |
Tk. 339.15 Lacs |
Length 6.00 Km Width 14.60m |
|
10. |
Consulting services for Detailed Digital Survey and Feasibility Study including IEE (Initial Environmental Examination) and EIA (Environmental Impact Assessment) of the proposed Project “Construction of Road, Bridge and Culver from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B & widening of Major Road 5) |
RAJUK |
Start Date: November 2017
Completion Date: March 2018 |
Tk. 57.38 Lacs |
Length · 3.89 km · 5.21 km and 6.15 km |
|
11. |
Feasibility Study for the Project “Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road and Kapasia Bazar to Sucharan Mor.” |
RDA |
Start Date: March 2017
Completion Date: April 2017 |
Tk. 3.50 Lacs |
Length 1.10 km Width 18.28m (60feet). and Length 2.35 km Width 24.38m (80ft). |
|
12. |
Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road [21 km (approx.) of the R203 road.] and Bridges & Culverts under Brahmanbaria Road Division. |
RHD |
Start Date: August 2015
Completion Date: March 2016 |
Tk. 4.505 Million |
Length 19.350 Km Width 7.30m |
|
13. |
Consulting services for Strengthen of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. Phase – I : Design Phase |
CDA |
Phase – I Start Date:25/11/2010
Completion Date:24/02/2012 |
230.00 Lacs |
Length 6.00 Km Width 14.60m |
|
14. |
Consulting services for Detailed Design and Construction Supervision of Sylhet-Tamabil-Jafflong Road Improvement Project. |
RHD |
Start Date: 8/2/1998
Completion Date: 30/4/2002 |
1.402 Million |
Length 61Km Width 7.30m |
|
15. |
IDA financed Construction Supervision for Rehabilitation of Dhaka-Sylhet Road Project |
RHD |
Start Date: 14/5/1999
Completion Date: 30/12/2004 |
5.90 Million |
Length 223.5 Km Width 7.30m |
|
16. |
Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Construction of Andkoy – Aquina Road |
MPW |
Start Date: July 2007 Completion Date: April 2013 |
USD 1.24 million (BDT 104.16 million) |
Length 32 Km Width 7.00m |
|
17. |
Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Rehabilitation of Doshi-Pol-E Khumri existing Road, |
MPW |
Start Date: Jul 2007 Completion Date: October 2014 |
USD 1.411 million (BDT 118.524 million) |
Length 51 Km Width 7 & 14 meter |
|
18. |
Design Review, Supervision Consultancy Service of Jabul Saraj-Nijrab Road Projec |
MPW |
Start Date: November 2010 Completion Date: July 2018 |
USD 2.184 million (BDT 183.456 million) |
Length 50 Km Width 7.0 m |
|
19. |
Design review, Supervision Consultancy for construction supervision of Fayzabad – Eshkashim (43 km) (Fayzabad-Beharak) Road Project. |
MPW |
Start Date: Mar 2012 Completion Date: July 2018 |
USD 4.144 million (BDT 348.096 million) |
Length 43 Km Width 7.0 m |
|
20. |
Khulna By-pass Road under Rupsa Bridge Construction Project |
RHD |
Start Date: 17/6/2001
Completion Date:30/3/2006 |
US$ 16.80 Million, (Tk. 100.80 crores) |
Length 17 Km Width 7.30m |
|
21. |
Consulting services for Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement Project. (Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road). |
RHD |
Start Date: 24/6/2002
Completion Date:30/7/2005 |
0.49 Million |
Length 14.89Km Width 7.30m |
|
22. |
Construction of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road) |
RAJUK |
Start Date: March, 2009
Completion Date: June 2011 |
Tk. 184 Lacs (US$ 0.27 Million ) |
Length 7.0 Km Width 30 m |
|
23. |
Design, Supervision & Monitoring of Madani Avenue Road Project (form Progoti Sarani Intersection to Balu River)
Phase – I : Design Phase Phase – II : Construction Supervision Phase |
RAJUK |
Start Date: 5/6/2011
Completion Date: 30/12/2013 |
133.00 Lacs |
Length 6.18 Km Width 21.6& 7.30m |
|
24. |
Road Condition Assessment Works of RHD Road Network during the year 2012-2013 (East Zone of Bangladesh) |
RHD |
Start Date: May 2013
Completion Date: September 2013 |
Tk. 354 Lacs |
Road Condition Assessment Works on RHD road networks of about 10800 Km Road. |
|
25. |
Road Condition Assessment Works of RHD Road Network during the year 2012-2013 (West Zone of Bangladesh) |
RHD |
05/2013 – 09/2013 |
Tk. 340 Lacs |
Road Condition Assessment Works on RHD road networks of about 10600 Km Road. |
|
26. |
Road Condition Assessment Works of RHD Road Network during the year 2009-2010 |
RHD |
04/2010 – 08/2010 |
USD 0.13 million |
Road Condition Assessment Works on RHD road networks of about 7,420 Km Road. |
|
27. |
Road Condition Assessment Works of RHD Road Network during the year 2008-2009 (Package-2) |
RHD |
04/2009 – 07/2009 |
USD 0.27 million |
Road Condition Assessment Works on RHD road networks of about 9,137 Km Road |
|
28. |
Road Condition Assessment Works of RHD Road Network during the year 2007-2008 |
RHD |
12/2007 – 06/2008 |
USD 0.27 million |
Road Condition Assessment Works on RHD road networks of about 14,427 Km Road |
|
29. |
Road Condition Assessment Works of RHD Road Network (Package 01) |
RHD |
06/2004 – 12/2004 |
USD 0.43 million |
All over the country. |
|
30. |
NDF funded Road Safety Measures on National Regional Roads |
RHD |
02/1998 to 2002 |
Tk. 412.147 Lacs |
|
|
31. |
DANIDA Financed Dhaka Aricha Highway Rehabilitation Project (Design, Tendering & Construction Supervision) |
RHD |
May 1993 March 1999 |
US$ 0.38 Million |
|
|
32. |
Road Rehabilitation and Maintenance Project. (NW) (RRMP) (Funded By IDA), Package 1 & 2 |
RHD |
February , 1988 March 1995 |
US$ 4,574,299 BDT 875,86,400 |
|
|
33. |
Supervision of Strengthening of Pavement Work of Feni Bypass Road. (IDA Credit No. 1301-BD) |
RHD |
November 23, 1983 November, 1985 |
Tk. 4,094,750 |
|
Bridge Sector
|
Sl. No. |
Name of Project |
Client/ Fund |
Period of Execution |
Total value of the services (Contract Value) |
Size & Type |
|
1. |
Consultancy Services for Detailed Structural Design of Seventy-Five Bridges of more than 100m in Length under Different Locations in Eight Divisions, under Feasibility Study for Important Bridge Construction on Rural Roads Project (2nd Phase). (Package No.: FS/24-25/BSD-1). |
LGED |
Start Date: June 2025
Completion Date: Ongoing |
Tk. 3,98,10,000.00 |
The 75 bridge sites are located in 8 Divisions, 22 Districts and 44 Upazilas in the northeast, far and near northwest, southwest and central southeast regions. |
|
2. |
Program for Supporting Rural Bridges (SupRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17-1 |
LGED |
Start Date: July 2023
Completion Date: Ongoing |
Tk. 154.05 Lacs |
The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
|
3. |
Program for Supporting Rural Bridges (SupRB): Consultant for Region (Survey & Supervision Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 18-1 |
LGED |
Start Date: July 2023
Completion Date: Ongoing |
Tk. 129.36 Lacs |
The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
|
4. |
Program for Supporting Rural Bridges (SupRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 26-1 |
LGED |
Start Date: July 2023
Completion Date: Ongoing |
Tk. 344.29 Lacs. |
The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
|
5. |
Consultancy Services for Detailed Design, Tender Assistance and Project Implementation of Construction of Nalua-Baherchar Bridge over the river Pandab-Paira at 27th km of Barishal (Dinerarpool)-Laxmipasha-Dumki Road (Z-8044). |
RHD |
Start Date: June 2023
Completion Date: Ongoing |
BDT 7,274.60 Lacs
US$ 6.705 Million |
Length of Bridge: 1300.00M Detailed Design, Tender Assistance and Project Implementation |
|
6. |
Consultancy Services for Bridge/Culvert Inspection and Data Entry Operation with the Help of Existing Manuals and BMS Software under Barisal Zone and Khulna Zone of Roads and Highways Department (Proposal Package No: SPDC/S/04/2021-2022) |
RHD |
Start Date: October 2023
Completion Date: Ongoing |
BDT 107180000.00 |
approximately 1125nos. bridges and 4955nos. Culverts. |
|
7. |
Construction Supervision of Construction of Sonahat Bridge over the River Dudhkumar at Bhurungamari – Sonahat Landport Mothergonj-Bhitorbondh-Nageshwari Road. |
RHD |
Start Date: September 2019
Completion Date: September 2023
|
Tk. 362.75 Lacs |
The Project Covering (i) 645.015m PC Girder Bridge including 2.32 km approach Road and an office building cum inspection banglow. |
|
8. |
Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17 |
LGED |
Start Date: October 2019
Completion Date: March 2023 |
Tk. 286.47 Lacs. |
The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
|
9. |
Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Mymensinghh Division). Proposal Package No: SupRB/2018-19/SD 18 |
LGED |
Start Date: August 2019
Completion Date: July 2023 |
Tk. 255.62 Lacs |
The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
|
10. |
Program for Supporting Rural Bridges (SurRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensinghh Division). Proposal Package No: SupRB/2018-19/SD 26 |
LGED |
Start Date: October 2019
Completion Date: November 2022 |
Tk. 544.72 Lacs. |
The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
|
11. |
Design Review, Tender Documentation and Construction Supervision for Construction of Shitalakhya Bridge (1234.50m) Project (3rd Shitalakhya Bridge Construction Project at Bandar Upazilla, Narayanganj), And 72 Km Road, Bangladesh (Saudi Development Fund) |
RHD |
Contract Date: February 2014 Start Date: March 2014 Completion Date: July 2023 |
Tk. 2.2 million |
1234.50m (Box Girder Bridge) |
|
12. |
Construction of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women). Construction Supervision Phase |
CDA |
Start Date: June 2015 Completion Date: May 2017 |
Tk. 376.337 Lacs |
Length: (30X 5) m (PSC) (40X 1) m (PSC) (24X 1) m (RCC) (425.55X 1) m (PSC) |
|
13. |
Consulting services for Strengthen of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. |
CDA |
Start Date: 25/11/2010 Completion Date: 24/02/2012 |
Tk 230.00 Lacs |
Length: (42X 2) m (PSC) (12X 1) m (RCC) (22X 1) m (RCC) (20X 1) m (RCC) |
|
14. |
Techno Economic Feasibility Study, Digital Topographical Survey, Sub-soil Investigation, Detailed Engineering Design, Cost Estimate and Bill of Quantities (BOQ) for Construction of RCC Bridge on Achintapur UP H/Q – Bhalukapur Bazar Road (Road ID 361233025) at Chainage 3800m over Jalburunga River under Gouripur Upazila, Dist.-Mymensinghh. |
LGED |
Start Date: 06-Mar-2017
Completion Date: 05-Apr-2017 |
Tk. 2.35 Million |
Length: 120m Long RCC Bridge |
|
15. |
Sub-Soil Investigation & Digital Topographical Survey, Detail Design, Drawing (Draft & Final) and Cost Estimate for 40 (Forty) Bridges with Provision for Hydro-Morphological Study 01 (One) Bridge. |
LGED |
Contract Date: February 2016 Start Date: March 2016 Completion Date: December 2016 |
Tk. 3.57 Million |
40 number Bridge. Length Varies from 15 m to 75 m |
|
16. |
Preparation of Detail Structural Design, Estimate, Technical specification and Standard Tender Document of 02 (Two) bridges under Manikgonj District. |
LGED |
Contract Date: October 2013 Start Date: October 2013 Completion Date: December 2013 |
Tk. 4.499 Million |
Length:
(315X 1) m (PSC) 9 Spans, Span length 35 m Each) (297X 1) m (PSC) of 9 Spans, Span length 33 m Each) |
|
17. |
Detailed Structural Design, Estimate, Technical specification and Standard Tender Document of 03 (Three) Bridges under Naogaon & Manikgonj District. |
LGED |
Contract Date: March 2013 Start Date: March 05, 2013 Completion Date: June 05, 2013 |
Tk. 53.995 Lac |
Length:
(217X 1) m (PSC) 7 Spans, Span length 31 m Each) (125X 1) m (RCC) 5 Span, Span length 25 m Each) (297X 1) m (PSC) 9 Span, Span length 33 m Each) |
|
18. |
Construction of Two Bridges (560 m each) on Brammaputra River Under Islampur Upazila of Jamalpur District. |
LGED |
Contract Date: June 08, 2011 Design Phase: Start Date: June 2011 Completion Date: August 2011 |
0.053 Million (Tk. 3.95 Million) |
Length: (560 X 1) m PC Girder 16 Span, Span length 35 m Each) (560 X 1) m PC Girder 16 Span, Span length 35 m Each) |
|
19. |
Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road [21 km (approx.) of the R203 road.] and Bridges & Culverts under Brahmanbaria Road Division. |
RHD |
Start Date: August 2015
Completion Date: March 2016 |
Tk. 4.505 Million |
Length: (30X 5) m (PSC) (40X 1) m (PSC) (24X 1) m (RCC) (425.55X 1) m (PSC) |
|
20. |
Economic Analysis of Proposed 05 (Five) nos. Bridges over Different 05 (Five) Rivers on Netrakona District. |
LGED |
Start Date: Mar. 12, 2013
Completion Date: May 11, 2013 |
Tk. 13.29 Lac. |
Length:
224×1 m (PSC) 150×1 m (RCC) 110×1 m (RCC) 125×1 m (RCC) 110×1 m (RCC) |
|
21. |
Economic Analysis of Proposed 04 (Four) nos. bridges over different 04 (Four) rivers on Jamalpur District. |
LGED |
Start Date: Feb. 03, 2013
Completion Date: Apr. 03, 2013 |
Tk. 10.52 Lac |
210×1 m (RCC) 585×1 m (PSC) 125×1 m (RCC) 90×1 m (RCC) |
|
22. |
Consulting services Feasibility Study and Preliminary Design for a) construction of Bridge at Ferry Location at 70th Km on Labukhali – Dumki – Boga – Dashmina – Golachipa – Amragachi Road (Z8806); (Length: 1600 m) (b) construction of Bridge at Ferry Location at 53rd Km on Barishal – Jhalokhati – Bhandaria – Perojpur Road (R870) over the river Kocha; (Length: 2000 m) and (c) Construction of Bridge at Ferry Location at 8th Km. on Rahmatpur – Babugonj – Muladia – Hizlakok Road (Z8034) under BBA” (Length: 1800 m) under Bangladesh Bridge Authority. |
BBA |
Start Date (Month/year): June 2011 Completion Date (month/year): February 2012 |
Tk. 204.5 Lacs |
Length: 1600×1 m (Segmental Box Girder) 2000 x1 m (Segmental Box Girder) 1800 x1 m (Segmental Box Girder) |
|
23. |
Feasibility Study for Construction of Bridge at Ferry Location at 17th Km on Kachua – Betagi – Patuakhali – Lohalia – Kalaya Road (Z8052) |
BBA |
Start Date (month/year): September 2011 Completion Date (month/year): March 2012 |
Tk. 98.65 Lacs |
Length: 1750×1 m (Segmental Box Girder) |
|
24. |
Sylhet-Tamabil-Jaflong Road Improvement Project. [Hazrat Shah Paran (2nd Surma) Bridge & Other Drainage Structures] |
RHD |
Start Date: July 2002 Completion Date: January 2006 |
0.45 Million |
Length: 392 m PC Girder |
|
25. |
Design, Supervision & Monitoring of Madani Avenue Road Project (form Progoti Sarani Intersection to Balu River)
Phase – I: Design Phase Phase – II: Construction Supervision Phase |
RAJUK |
Contract Date: June 05, 2011 Phase – I Start Date: 5/6/2011 Completion Date: 30/1/2012 Phase – II Start Date: 1/3/2012 Completion Date: March 2014 |
133.00 Lacs |
Length: (30 X 2) m (90 X 1) m (60 X 1) m PC Girder |
|
26. |
Detail Design, Supervision and Monitoring for the Construction of Roads, Bridges / Culverts of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road) |
RAJUK |
Contract Date: March 12, 2009 Start Date: March 2009 Completion Date: September 2013 |
Tk. 184 Lacs (US$ 0.27 Million ) |
Approximately length 40 to 50m each |
|
27. |
Detailed Design and Construction Supervision of 7 Nos. of Bridge Construction Work of Purbachal New Town Project. |
RAJUK |
Contract Date: November 25, 2009 Start Date: November 2009 Completion Date: February, 2011 |
0.092 Million |
7 nos. of Bridges, Approximate length 40 to 50m each |
|
28. |
Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. |
BD Army |
Start Date: April 2014
Completion Date: March 2017 |
Tk. 189.00 Lacs |
Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. |
|
29. |
IDA financed Rehabilitation of Dhaka-Sylhet Road |
RHD |
Contract Date: May 14, 1999 Start Date June 1999
Completion Date December 2004 |
5.90 Million |
Length: 37 Nos. P.C. Girder Bridges, approximately 1295 m in length |
|
30. |
JBIC funded Supervision of Paksey Bridge Construction Project |
RHD |
Start Date June 1998
Completion Date April 2004 |
5.25 Million |
1786m, consisting of 15 spans each 109.5m long, plus two shorter end spans each 71.75 meter long. |
|
31. |
Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Construction of Andkoy – Aquina Road |
MPW |
Start Date: Jul 2007
Completion Date: April 2013 |
USD 1.24 million (BDT 104.16 million) |
Approximate length 40 to 50 m each |
|
32. |
Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Rehabilitation of Doshi-Pol-E Khumri existing Road, |
MPW |
Start Date: Jul 2007
Completion Date: October 2014 |
USD 1.411 million (BDT 118.524 million) |
Approximate length 40 to 50 m each |
|
33. |
Supervision Consultancy Service of Jabul Saraj-Nijrab Road Project MPW/869/ ABD/QCBS |
MPW |
Start Date: November 2010
Completion Date: July 2018 |
USD 2.184 million (BDT 183.456 million) |
Approximate length 40 to 50 m each |
|
34. |
Supervision Consultancy for construction supervision of Fayzabad – Eshkashim (43 km) (Fayzabad-Beharak) Road Project PW/870/ BD/QCB |
MPW
|
Start Date: Mar 2012
Completion Date: July 2018 |
USD 4.144 million (BDT 348.096 million) |
Approximate length 40 to 50 m each |