Project Name |
Client |
Firms Responsibility |
Funding Agency |
---|---|---|---|
Preparation of Detail Structural Design, Estimate, Technical specification and Standard Tender Document of 02 (Two) bridges under Manikgonj District. |
Local Government Engineering Department, Government of Bangladesh |
Detailed Investigation, survey, Structural design, preparation of specification of contractors, bid invitation |
GOB |
Detailed Structural Design, Estimate, Technical specification and Standard Tender Document of 03 (Three) Bridges under Naogaon & Manikgonj District. |
Local Government Engineering Department, Government of Bangladesh |
Detailed Investigation, survey, Structural design, preparation of specification of contractors, bid invitation |
GOB |
Consultancy Services for Soil test, Design and supervision of Construction of two Bridges on Brammaputtra river under Islampur Upazila of Jamalpur District |
Local Government Engineering Department, Government of Bangladesh |
Detailed Investigation, survey, Structural design, preparation of specification of contractors, bid invitation and construction Supervision |
GOB |
Detailed Design, Supervision and Monitoring for the Construction of Road, Bridge and Culverts of Extension of Madani Avenue Project (From Progoti Sarani Intersection to Balu River) |
Rajdhani Unnayan Kartripakkha (RAJUK) |
Detailed Investigation, survey, Structural design, preparation of specification of contractors, bid invitation and construction Supervision |
GOB |
Detail Design, Supervision and Monitoring for the Construction of Roads, Bridges / Culverts of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road) |
Rajdhani Unnayan Kartripakkha (RAJUK) |
Detailed Investigation, survey, Structural design, preparation of specification of contractors, bid invitation and construction Supervision |
GOB |
Supervision of 7 Nos. of Bridge Construction Work of Purbachal New Town Project. |
Rajdhani Unnayan Kartripakkha (RAJUK) |
Detailed Investigation, survey, Structural design, preparation of specification of contractors, bid invitation and construction Supervision |
GOB |
Basic Study on the Present Situation of the Previous Grand Aid Projects for the Bridges in Bangladesh. |
Japan International Co-operation Agency (JICA) |
Study |
JICA |
Sylhet-Tamabil-Jaflong Road Improvement Project. [ Hazrat Shah Paran (2nd Surma ) Bridge & Other Drainage Structures] |
Roads & Highways Department, GOB |
The Rehabilitation of 61 km long Sylhet-Tamabil-Jaflong Road located in the north-eastern part with Hazrat Shah Paran (2nd Surma) Bridge and other drainage structures. The length of Hazrat Shah Paran (2nd Surma) Bridge is 392m, bridge over Kushi Khal 45m and the length of 22 cross-drainage structure is about 107.50m of Bangladesh provides direct link to capital city of Dhaka. |
KFAED |
Construction Supervision for Rehabilitation of Dhaka-Sylhet Road (Bridge Component) |
Roads & Highways Department, Ministry of Communication, |
Detailed Engineering Design & Supervision for Rehabilitation Works includes most remarkablyreplacement of old under-capacity Bridges/Culverts and construction of 301 structures including 37 Nos. P.C. Girder Bridges and 347 Nos. Box Culverts with single and multiple cells, and 2 nos. Railway Over Pass at chainage 3+058 and 35+871 respectively. Entire Project has been divided into 6 Nos. Contracts in two phases of Dhaka - Sylhet Road Rehabilitation Project |
IDA |
Supervision of Paksey Bridge Construction Project. |
Roads & Highways Department. GOB |
Design Review and Project Management and full time Supervision of Construction of Pre-cast ,Prestressed concrete glued segment box girder balanced cantilever Bridge has an overall length of 1786 m consisting of 15 spans .The superstructure is a 4 lane continuous overall width is 18.10 . |
JBIC |
Road Rehabilitation and Maintenance Project (NW) Phase-II (Bridge Component) |
Roads & Highways Department |
Detailed investigation, structural design and full time construction supervision of 3 nos, pre-stressed and 1 no R.C.C bridge |
IDA |
Dhaka-Aricha Highway Rehabilitation Project (Bridge Component): Design & Tendering |
Roads & Highways Department/ DANIDA |
Detailed investigation, structural design and preparation of tender documents for 4 nos. R.C.C slab bridges over steel joist with pre-cast R.C.C piles. |
DANIDA |
Construction supervision of Bridges & Culverts under FFW Structure P)program (1990-1993) in Zone VI. |
Relief & Rehabilitation Directorate. |
Detailed Investigation, survey, Structural design, preparation of specification of contractors, bid invitation and full time super vision of construction works of 11 no of bridges and 7 no. of culverts. |
DANIDA/ USAID |
Pre-investment Study for Second Road Rehabilitation & maintenance Project ( Bridge Component) |
RHD |
Detailed Engineering Design and preparation of bidding documents for II nos. Bridges. |
GOB/ IDA |
Construction of Bridges and Culverts in 3-Upazilas of Rajshahi Division (1984-86) |
Relief & Rehabilitation Directorate. |
Supervision of construction works of 4 nos. RCC bridges on well foundation. |
USAID |
Construction of Bridges and Culverts in 8-Upazilas of Khulna Division (1986-88) |
Relief & Rehabilitation Directorate. |
Detailed investigation survey, engineering design, specifications, tender documents, pre-qualification of contractors, bid invitation and full time supervision of construction of 13 nos. bridges and 5 nos. culverts. |
USAID |
Construction of Bridges and Culverts in 8-Upazilas of Dhaka Division (1984-86) |
Relief & Rehabilitation Directorate. |
Review of design Preparation of specifications, tender documents, pre-qualification of contractors, bid invitation, evaluation and super vision of construction works of 22 nos. bridges and culverts. |
USAID |
Construction of Bridges and Culverts in 6-Upazilas of Chittagong Division (1984-86) |
Relief & Rehabilitation Directorate. |
Survey investigation, design preparation of specifications, tender documents, pre-qualification of contractors, bid invitation, full time supervision of construction works of 16 nos. of bridgs & culverts. |
USAID |
Construction of Bridges and Culverts in 8-Upazilas of Chittagong Division (1984-85) |
Relief & Rehabilitation Directorate. |
Full time construction of 20 nos. bridges & culverts and preparation of revised structural design of 160 ft. span length RCC balances cantilever bridge. |
USAID |
Construction of Bridge and Culvert in 5 Upazilas of Dhaka Division (1984-85) |
Relief and Rehabilitation Directorate, Govt of Bangladesh |
Survey investigation, design preparation of specifications, tender documents, bid invitation, evaluation full time supervision of construction works . |
US-AID |
Khulna - Mongla Road Project (bridge Component) |
RHD |
Detailed investigation, structural design and full time construction supervision of 7 Nos of Bridges of Khulna-Mongla Road. |
ADB |
Construction of 150 ft. long Assam basti Bridge in Rangamati. |
Chittagong Board, Rangamati |
Detailed investigation, design , estimate tender documents and top supervision. |
GOB |
Construction of 2 Nos. Bridges in Noakhali District. |
Zila Porishad Noakhali |
Detailed investigation, design, tender documents and contruction supervision |
GOB |
Construction of 3 Nos. War damaged Bridges in Noakhali District. (Design Phase) |
RHD |
Detailed investigation, hydrological studies, design, tender documents, construction management and supervision of works. |
GOB |
Construction of Bridges over Jamuna, Chirri and Chicknai River, in Rajshahi & Bogra District. |
Rajshahi Development Board |
Detailed investigation, design and preparation of tender documents |
GOB |