Project Name |
Client |
Firms Responsibility |
Funding Agency |
---|---|---|---|
Khulna by-pass Road under Rupsa Bridge Construction Project |
RHD |
Environmental & Re-settlement Monitoring & Management which include preparation of detailed program of compensation and rehabilitation of PAPs for the welfare of displaced persons, Monitoring of the land acquisition process including re-settlement and compensation and environmental matters |
GOB |
Sylhet Tamabil- Jaflong Road Improvement Project ( Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road including Hazrat Shah Paran Bridge over River Surma and other Drainage Structure |
RHD |
a) Identification of shifting of utilities and trees; b) Preparation of land Acquisition Plans |
KFAED |
Construction Supervision for Rehabilitation of Dhaka Sylhet Road |
RHD |
a) Environmental Aspect : Under this component, the consultant whould review the previous studies of the project including the World Banks guidelines and GOB's policies on the environmenatl aspects and ensure proper implementation of the project as per guidelines, policies set-forth in the aforesaid documents. b) Resettlement & Socio-Economic Aspects: Under this component, the consultant would review all previous studies including World Bank's Guidelines GOB's policies, acts and laws on resettlement component of Road projects and ensure its proper implementation. |
IDA |
Dhaka Urban Transport Project (DUTP) |
Dhaka Transport Co-ordination Board |
Re-settlement Action Plan: This component of the Project involves Preparation and implementation of resettlement action plan and economic assessment as per IDA Guidelines. |
IDA |
Pakshi Bridge Construction Project |
RHD |
Implementation of social Action Plan, Environmental Aspects and Relocation of Utilities. The following aspects have been considered in the programme of social and environmental management of the project: water pollution, soil Conservation in erosionand sedimentation control, Dust, Fuel/ Oil Storage and spills, Noise, Protection of trees, Embankment slope Stability and Drainage. During construction supervision, the Consultant ensured the protection of the social and biophysical environmen, to minimize impacts, to ensure mitigation actions are carried out effectively and to preserve worker and public safety. |
JBIC |
Basic Study on the Present situation of the Previous Grant Aid Project for the Bridges in Bangladesh |
Japan International Co-operative Agency (JICA) |
Under Basic Study, Resident's Opinion Survey was carried out to evalute appropriateness of Basic Design criteria conducted by JICA for Grant Aid Projects for Bridges in Bangladesh. The assignment also include coding and in-put of data and report preparation. |
JICA |
Resettlement Plan for Project Affected People (PAPs) of the by-pass and realignment under Second Road Rehabilitation and Implementation Projecy |
RHD |
A Socio-Economic Survey of the Project Affected People ( PAPs) was carried out by SARM on the Four sections of Rajshahi-Nawabganj and Rangpur- saidpur relignments, Natore and Saidpur bypass totalling 25 km. Consultant's assignment included socio-economic survey, preparation of appropriate resettlement and rehabilitation plan of the PAPs and ID Cards folowing IDA guidelines. |
IDA |
Socio- Econimic- Survey of the Project Affected Families ( PAPs) of the By-pass and Re-alignment under RRMPII. |
RHD |
The field survey on the socio-economic context of the affected households was caried out by SARM with a view to generating data which will be used; i) to assess the scale of population displacement; ii) to examine the impact of loss of agricultural land on the productive/economic life of affected households and iii) to prepare plans to mitigate or address those problems in line with World Bank Guidelines. |
IDA |
Construction Supervision of Bridges and Culverts under FFW Structure Programme ( 1990-93) in Zone VI Rajshahi Division |
Relief & Rehabilitation Directorate |
Environmental Impact Assessment was carried out for 11 Nos. of bridges and 7 Nos of Culverts in 8 Upazilas of Greater Districts of Bogra, Rangpur and Dinajpur. Environment Study was carried out for assessment and evaluation of positiveor negative impacts on the existing natural environment that the construction of the project will have in the natural habitat, agriculture, flora and fauna, hydrological system, pollution hazards, navigation, road network and drainage structure etc. |
GOB |
Studies under Fourth Flood Control & Drainage Project (FCD- IV) ALA/87-2 |
Bangladesh Water Development board |
Monitoring and Evaluation of the Project covering institutional aspects, environmental aspects, economic and financial analysis etc. |
GOB |
Benchmark Survey for Flood Control & Drainage III Project in Comilla, Jessore and Naogaon Area |
Bangladesh Water Development board |
The Objective of the Benchmark Survey was to lay the foundation of a Broad-based agro-socio-economic data which facilitate the preparation of the Project Completion Report. |
GOB |
Evaluation Studies of Karnafuli Irrigation Project |
Bangladesh Water Development board |
The aim of the study was to evaluate the achievement and effectiveness of the irrigation, flood control and drainage works with particular reference to socio-ec0n0mic impact, crop production , rural employment and farm income. |
GOB |
Preparation of Master Plan for Nilphamari Municipla Area |
Local Govt. Engineering Bereau |
services rendered including detailed existing Land-Use survey, Collection of Socio-economic and demographic data, housing sector studies for preparation of Master Plan |
GOB |
Land use Plan for Netrokona Zila Shahar |
UDD |
services rendered including detailed existing Land-Use survey, Collection of Socio-economic and demographic data, housing sector studies for preparation of Master Plan |
GOB |
Land use plan for madan and mohangonj Upazila Shahar |
UDD |
services rendered including detailed existing Land-Use survey, Collection of Socio-economic and demographic data, housing sector studies for preparation of Master Plan |
GOB |
Urban Area development and environmental Improvement Project |
UDD |
it is a Low-Cost Housing Sub Project, under Urban Area Development& Environmental Chittagong Project. |
GOB |
Land use plan for Gaibandha Zila Shahar |
UDD |
services rendered including detailed existing Land-Use survey, Collection of Socio-economic and demographic data, housing sector studies for preparation of Master Plan |
GOB |
Land use Plan for 3 Upazila Shahar ( Saghata, Fulchari & Rajibpur) |
UDD |
services rendered including detailed existing Land-Use survey, Collection of Socio-economic and demographic data, housing sector studies for preparation of Master Plan |
GOB |
Preparation of development plans for Keranigonj Area Dhaka |
UDD |
services rendered including detailed existing Land-Use survey, Collection of Socio-economic and demographic data, housing sector studies for preparation of Master Plan |
GOB |
upazila Land use/ Master Plan for 5 Upazilas of Jessore District. |
UDD |
services rendered including detailed existing Land-Use survey, Collection of Socio-economic and demographic data, housing sector studies for preparation of Master Plan |
GOB |