Project Name |
Client |
Firms Responsibility |
Funding Agency |
---|---|---|---|
Detailed Engineering Design (DED), Project Management and Supervision Consultancy Services for Construction of Andkoy – Aquina Road |
Ministry of Public Works (MPW),Islamic Republic of Afghanistan. |
Detailed Engineering Design ,Project Management and full time Supervision of Construction of 2-Lane 34 Km of new Super Highway.Available information with regard to topographic surveys, soils and materials surveys, bridge/culvert surveys, hydrological/hydraulic surveys, Benkleman Beam tests etc. |
IDB |
Detailed Engineering Design (DED), Project Management and Supervision Consultancy Services for Rehabilitation of Doshi-Pol-E Khumri existing Road, |
Ministry of Public Works (MPW),Islamic Republic of Afghanistan. |
Detailed Engineering Design ,Project Management and full time Supervision to upgrade and rehabilitate the 51 km of existing Road. Available information with regard to topographic surveys, soils and materials surveys, bridge/culvert surveys, hydrological/hydraulic surveys, Benkleman Beam tests etc. |
IDB |
Planning and Designing of Various Infrastructure and Utility Plans and Components with Ancillary Works for Purbachal New Town Project (Similar Assignment: Design of Water Supply and Sewerage System) |
Rajdhani Unnayan Kartripakkha (RAJUK) |
The Purbachal Project area located in three administrative district of Dhaka, Narayanganj and Gazipur spreads over Strategic Planning of Zone 19 desiganated as RAJUK EAST. The Project area covers about 6150 acres of land and served by the river sitalakhya and Balu rivers. the main purpose of the project is to install a new and independent township to accommodate a projected population of one million with all modernized facilities and utility services including power and electricity supply, sustainable transportation network, water supply, swewrage & drainage system, recreation and community development etc. |
RAJUK |
Road Condition Assessment Works of RHD Road Network (Package 1) |
Roads and Highways Department |
roposed RRMP-IV (ADB assistance project) during the year 2003-2004. This assessment will also be helpful for RHD annual maintenance plan as the Consultants of CIDC-3 has opined that the data collected form field Divisions in the past and lying with HDM Circle of RHD should not be used for annual maintenance works unless it is rectified. The assessment work will be for the whole of Bangladesh National and Regional Highways & Zilla roads network under RHD. |
GOB |
Sylhet- Tamabil- Jaflong Road Improvement Project (Sylhet Town By-pass with Link to Sylhet-Fenchuganj Road including 392m long 2 lane Prestressed Concrete Girder bridge over river Surma. |
Roads and Highways Department, Govt. of Bangladesh |
Detailed Engineering Design & documentation and Full time Construction Supervision of a)14.89 Km 2 Lane Sylhet Town By-Pass Road along with b) 392m long 2 Lane Prestressed Concrete Girder Bridge. |
KFAED |
Khulna By-pass Road under Rupsa Bridge Construction Project |
Roads and Highways Department, GOB. |
Survey, Investigation ,Detailed Engineering Design & Full time Construction Supervision of 2 Lane 17 km long Khulna By-pass Road |
|
Regional Road Network Study for Prioritization under RRMIMP-II |
LGED |
Produce priority list of core FRBs proposed to be maintained and another list of core FRBs for its improvement to the national standard for all 64 districts within 6 divisions in bangladesh with a networking approach. |
GOB/ International & Bi-Lateral Donors |
Construction Supervision for Rehabilitation of Dhaka-Sylhet Road |
Roads & Highways Department, Ministry of Communication, |
Detailed Engineering Design & Supervision for Rehabilitation of 2 Lane 250 Km Dhaka-Sylhet Road along with 347nos. Structures. |
IDA |
Dhaka Urban Transport Project (DUTP) |
Greater Dhaka Transport Planning and Coordination Board (GDTPCB),Ministry of Communications, GOB. |
To design, where appropriate and supervise implementation of a range of infrastructure component such as a)Intersection Improvement b)Arterial Road Improvement, c)Parking Facilities, d)Implementation of auto restricted zone, e)Major Grade Separation Structures : This component involves construction Supervision of Mohakhali and Jatrabari flyovers. |
IDA |
Sylhet-Tamabil-Jaflong Road Improvement Project (Original Work) |
Roads & Highway Department |
Detailed engineering design of 61 km of road to be rehabilited along with 62 nos. of drainage structures, based on topographical survey, hydrological and geo-technical investigation, preparation of Tender Documents, BOQ, Estimate, contract award services and full time construction supervision and monitoring. |
GOB |
Road Safety Measures on National & Regional Roads. |
Roads and Highways Departmen |
In Bangladesh, there are aboutn 360,000 vechicles on the road with a population of 116 million having a public road network of 133,000 km and 1600 fatalities resulting from the road accidents ( estimated 1995 figures), the fatality rate (number of persons killed in such accident in a given year per 10,000 vechicles) of 44 is far too high, even comparing with many developing countries in the region. The project form part of a Government-sponsored program designed to counter the serious and growing road safety problem in the country. the project include improving the knowledge, capability and training of personnel associated with accident prevention in the field of accident analysis, traffic engineering and management and design of low cost road accident countermeasures of national and regional road network under RHD. |
GOB |
Dhaka-Aricha Highway Rehabilitation Project (Design, Tendering and Construction Supervision) |
DANIDA/RHD |
Contract management, construction monitoring and full time supervision of pavement and bridge rehabilitation works. |
DANIDA |
Road Rehabilitation and Maintenance Project (Phase-II) |
RHD |
Flood damage assessment, detailed investigation, redesign of pavement, bridges and necessary structures, assist RHD in pre-qualification of contractors and contract award services, contract management, construction monitoring and full time supervision of construction works. |
IDA |
Resettlement Plan for the Project Affected People (PAPs) of the By-passes & Realignment under Second Road Rehabilitation & Improvement Project in Northwest, Bangladesh. |
Roads and Highways Department. |
Based upon Socio-economic Survey, preparation of appropriate resettlement and rehabilitation plan for the Project Affected People ( PAPs) and ID Cards for PAPs |
IDA |
Detailed Engineering of First year Overlay Program at Western Zone of RHD (Component of RRMP-II) |
RHD |
Detailed engineering of about 416.70 km of overly, benkleman beam tests, roughness survey, pre-qualification of contractors and evaluation of 5 contracts. |
IDA |
Preparation of Revised Action Plan for Construction Industry Development in Bangladesh as a Component of RRMP-I |
For the Development of construction industry in Bangladesh a number of recommendations in the name of Bangladesh Construction Study were prepared by Consultant Freeman Fox of UK Bangladesh Plannning Commission in 1989. After review of the recommendations it was observed by the IDA that action plan is to be up-dated and revised by engaging a local consultant |
IDA |
|
Socio-Economic Survey of the Project Affected Families (PAFs) of the By-passes and Re-alignment under Second Road Rehabilitation and Maintenance Project |
RHD |
Socio-economic Survey of the Project Affected People, assessment scale of agricultural land etc and to prepare plans to mitigate the problems as per the World Bank Guide Lines. |
IDA |
Pre-investment Study for Second Road Rehabilitation & maintenance Project ( Bridge Component |
RHD |
|
GOB |
Road Rehabilitation and Maintenance Project (Phase-I) |
RHD |
Contract management, construction supervision and monitoring, re-design of bridges/ drainage structures and road embankment based on flood damage assessment of 1987 and 1988 floods. |
IDA |
Survey of Rural Road Network and Road Structures in 6 Upazilas of Feni, Noakhali and Lakshmipur District for IRDP |
Ministry of Local Govt. Rural Development & Co-operatives |
Survey of roads and road structures to assess the need for re-construction or maintenance under road improvement schemes. |
DANIDA |
Preparation of Upazila & Union Plan book Comprising of Communication Networks, Infrastructures etc. for improvement and upgrading in 15 Upazilas of 3 Districts of Bangladesh |
Ministry of LGRD & Co-operatives |
Preparation of Upazila and Union Plan Book comprisiong of communication network, infrastructure etc. suitable for Rural Works Programme Investment. |
ILO |
Preparation of Feasibility Studies of 20 Upazilas under Phase III of IRWP. |
Ministry of LGRD & Co-operatives |
Preparation of feasibility study for the development of madarganj and sharishabari Upazilas to achieve the objectives of IRWP. |
GOB/ LGRD |
Strengthening of Pavemeny Work of Feni Bypass Road |
RHD |
It is an IDA aided project,Original works of the Feni Bypass Road were done by m/s Amman & Whitney , a US Consultant Firm. After the failure and collapse of the pavement, the World Bank, for the first time, appointed SARM Associated Limited with the responsibility of review of pavement Design, construction management and full time on site supervision of construction of overly pavement works. |
World Bank |
South West Rural Development Project (RWP Component). |
Ministry of LGRD & Co-operatives |
Preparation of plan books, training programme and feasibility study. |
GOB |
100 Thana Intensive Rural Works Programme under Phase II in Mymensingh District (Kishoregonj, Pakundia, Hossainpur Thanas). |
Ministry of LGRD & Co-operatives |
Perparation of feasibility Studies for rural infrastructure and water resources development. |
GOB |
100 Thana Intensive Rural Works Programme, Phase I. |
Ministry of LGRD & Co-operatives |
Perparation of feasibility Studies for rural infrastructure and water resources development. |
GOB |
Khulna - Mongla Road Project |
RHD |
Survey , Geo-technical and hydrological investigation, detailed design of road embankment, pavement, bridges and culverts and full time supervision of construction works. |
ADB |
Feasibility Study and Detailed Engineering of Jamalpur-Akkelpur Badalgachi-Patnitola Road |
Rajshahi Division Dev. Board |
Detailed investigation, survey field and laboratory tests, specificatios, traffic survey & economic study. |
GOB |
Improvement of Rural Markets and Rural Road Network in three thanas of Noakhali District under IRDP-DANIDA Rural Development Project. |
IRDP – DANIDA |
Identification of rural roads and markets for improvement. |
DANIDA |