Project Name |
Client |
Firms Responsibility |
Funding Agency |
---|---|---|---|
Construction of Intake and connecting pipeline between Intake & Raw Water Pumping Station under BMRE of Chandighat Water Treatment Plant at Dhaka. |
Dhaka WASA |
Necessary site survey, detailed engineering design, preparation of drawings and specification only |
GOB |
50MGD Water Supply Project under Crash Programme for Dhaka City. |
Dhaka WASA |
Site Surveys, detailed engineering design and preparation of technical spcification |
GOB |
IDA financed 40 MGD Second Chittagong Water Supply Project. |
Chittagong Water Supply and Sewerage Authority |
Detailed Engineering design, specifications, tender documents, Tender evaluation and full time supervision of construction |
IDA |
Feasibility Study for Fresh Water Supply to Chalna Permanent Port. |
Port of Chalna Authority |
Survey, study and preparation of feasibility Report for supply of fresh water to chalna port |
IDA |
Engineering and Financial Management Study. |
Dhaka WASA |
Survey, study and preparation of report reflecting present and future development potential revenue income and benefit. |
IDA |