In Transportation Sector, SARM has earned reputation by working both at home and abroad.
Roads & Highways
International:
SARM has already entered into international sphere of Consultancy Services. Recently, SARM has been engaged by the Ministry of Public Works (MPW) of Islamic Republic of Afghanistan for Consultancy Services for two prestigious projects for preparation of detailed engineering design and bidding documents; assistance to the executing agency during procurement process and award of Contracts; project management and supervision of works during implementation. The prestigious projects are:
- Supervision Consultancy for construction of Road between Fayzabad – Eshkashim (43 km) [Fayzabad – Behrak] (ADB funded)
- 51 km, Rehabilitation of Doshi-Pol-E-Khomri Existing Road (IDB funded)
- 34 km long Andkhoy – Aquina Road (IDB funded)
- Supervision of 50 km Jabul Saraj-Nijrab Road Project (ADB funded)
Domestic:
SARM has provided consultancy services for several major, internationally financed road projects of the Roads and Highways Department of the Government of Bangladesh (GOB), apart from feasibility and sector studies for rural road network under the Ministry of LGRD & Cooperatives, DANIDA and ILO. In this sector, the firm has undertaken field surveys, investigations, embankment and pavement design of roads, preparation of estimates, technical specifications, tender documents and standard laboratory tests followed by full time supervision of construction works including supervision during maintenance period. The major projects are:
- Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet – Tamabil – Jaflong Road (N2) to a 4-Lane Highway and Construction of Service Lane on both sides funded by AIIB;
- Road Safety Audit of Jaydevpur-Mymensingh (N3), Kachpur-Daudkandi and Chittagong- Cox’s Bazar (N1), Kashinathpur-Rajshahi (N6) and Dhaka- Aricha (N5) (Total 500 Kilometer) National Highway during the Fiscal Year 2017-2018;
- Feasibility Study for the Project “Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road and Kapasia Bazar to Sucharan Mor”;
- Supervision and Management Consultant for Construction of 4-Lane Rajapara-Payra Port Connecting Road, Payra Port, Bangladesh (GOB funded);
- Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road (18 Km of R203) under Brahmanbaria Road Division;
- Consulting Services for Construction Supervision of Purbachal Link Road from Kanchan Bridge to Progoti soroni (Kuril) Package No- 01, under Purbachal New Town Project of RAJUK;
- Consultancy Services for Strengthen of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer periphery of AUW’s Land at Chittagong;
- Providing Consulting Services for Detailed Design, Supervision and Monitoring for the Construction of Road, Bridge and Culverts of Madani Avenue (from Progoti Sarani Intersection to Balu River);
- Sylhet-Tamabil-Jaflong Road Improvement Project. (Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road) KFAED funded;
- Road Condition Assessment Works of RHD Road Network during the year 2012-2013 (East & West Zone of Bangladesh – 02 Contracts);
- Road Condition Assessment Works of RHD Road Network during the year 2009-2010;
- 223 km long Rehabilitation of Dhaka-Sylhet Road; Rehabilitation of Dhaka- Sylhet Road (IDA funded);
- Dhaka Urban Transport Project (DUTP), Dhaka city (IDA funded);
- Sylhet-Tamabil-Jaflong Road (61 km long) Improvement Project; (KFAED funded);
- Khulna Bypass Road (17km long) under Rupsa Bridge Construction Project;
- 61 km rehabilitation of Dhaka-Aricha Highway Project including construction of 1 new bridge, rehabilitation and repair of 53 bridges and 2 nos. box culverts; (DANIDA financed);
- Road Rehabilitation and Maintenance Project (Phase I) comprising of rehabilitation of 136 km of National Highways and periodic maintenance of 110 km of Regional Highways; (IDA financed);
- Road Rehabilitation and Maintenance Project (Phase II) comprising of 156 km of Rehabilitation of National Highways and periodic maintenance of 60km of Regional Highways; (IDA financed);
- WB – Strengthening of Pavement Works of Feni By Pass Road (29 km);
- 35 km Khulna Mongla Road Project (ADB financed);
- Pre-investment Study of 204 km of roads under Second Road Rehabilitation and Maintenance Project (IDA financed);
- Road Safety Measures on National and Regional Roads, all over Bangladesh; (NDF funded);
- Survey and investigation works for 800 km of rural roads, including assessment of general conditions of road, road geometry, traffic counts both on normal and on week/market days etc. funded by DANIDA;
- ILO: investigation, planning and survey for improvement and upgrading of 4469 km of road in 15 Upazilas of Dhaka, Sylhet and Rajshahi Districts;
- Feasibility studies under Phase I, II & III of IRWP, planning survey and design of 93 km of rural roads in Madarganj and Sharishabari Upazilas of Jamalpur District, 51 km of rural roads in Pakundia and Hossainpur Thana of Mymensingh district and 661 km of rural road in Raozan and Fatickchari Thana of Chittagong District.
Bridges & Flyovers
In the Flyover & Bridge Sector, SARM has undertaken field investigations, site surveys and preparation of structural designs of bridges and culverts, technical specifications, estimates and tender documents. In the field of Construction Supervision & Project Management of Flyover & Bridges and Culverts as per requirement of the Client. Major consultancy services are rendered are:
Flyover Sector
Sl. No. | Project Name | Client/ Fund | Period of Execution | Total value of the services (Contract Value) | Size & Type |
1. | Prepare Detail Design, Drawing & Construction Supervision including other Incidental Works for Construction of 4 nos. Flyover at different Railway crossing under the project ‘Integrated Urban Infrastructure Development in Rajshahi City’ Package No. SW-02 (Lot-B). | RCC | Start Date May 2021 Completion Date Ongoing | Tk. 449.53 Lacs | a. Length: 400 m long Horogram Notunpara Railway Crossina Flyover b. Length: 521 m long Court Station Railway Crossing Flyover c. Length: 897 m long Kamaruzzaman Chottor Railway Crossing Flyover Length: 520 m long Vodra Railway Crossing Flyover |
2. | Prepare Detail Design, Drawing & Construction Supervision including other incidental works for Construction of Integrated Flyover at Bornali, Bondho Gate and New Bilsimla Railway Crossing along recently completed 4 lane Road under the project Integrated Urban Infrastructure Development in Rajshahi City (Lot-C). | RCC | Start Date May 2021 Completion Date Ongoing | Tk. 287.95 Lacs | Length: 1255 m long Bornali, Bondho gate and new Bilsimla Railway Crossing Flyover |
3. | Consulting services for Preparation of detailed Architectural & Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Elevated Expressway at Chittagong from Lalkhan Bazar to Shah Amanat Airport. | CDA | Start Date: July 2018 Completion Date: Ongoing | Tk. 4566.93 Lacs | Four-lane elevated expressway. Length: 16.5 km Width: 16.5 meters. |
4. | Consulting services for a 04 (Four) Lane Overpass under the Project “Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised).” | RDA | Start Date: January 2018 Completion Date: April 2020 | Tk. 91.70 Lacs | Four Lane Overpass. Length: 642.00 meter |
5. | Detailed Design for an Overpass under the Project of “Construction of Connecting Road from Natore Road (RUET) to Rajshahi by-pass Road | RDA | Contract Date: May 21, 2015 Start Date: May 21, 2015 Completion Date: October 18, 2015 | Tk. 18 Lacs | Length: 643 m, 2 Lane PC Girder |
6. | Design Review and Construction supervision of Flyover Bridges in Dhaka [Construction Moghbazar – Mouchak (combined) Flyover] Project | LGED | Contract Date: June 12, 2012 Start Date: June 27, 2012 Completion Date: December, 2014 | 1156.12282 Lacs | Eight Km (8000 meter) |
7. | Supervision of Construction work of Kadamtoli Junction Flyover, Chittagong | CDA | Contract Date: December 26, 2013 Start Date: January 2014 Completion Date: May 2015 | Tk. 130.30 Lacs | Length: 645 m PC Girder |
8. | Prefeasibility Study, Feasibility Study, Detailed Design and construction supervision of Flyover at Muradpur, 2 no. Gate & GEC Junction, Chittagong | CDA | Start Date: January 2014 Completion Date: December, 2017 | Tk. 905.00 Lacs | 5.2 Km (5200 meter) |
9. | Detailed Engineering Design and Construction Supervision for Railway Overpass and Road connecting between Bijoy Sarani and Tejgaon Industrial Area. | RAJUK | Contract Date: March 09, 2011 Start Date: March 2008 Completion Date: April 2010 | Tk 24.89 Lacs | Length: 669.00 m, 4 Lane PC Girder |
10. | Dhaka Urban Transport Project (DUTP) · Design review and Construction Supervision of Mohakhali Flyover. · Feasibility Study of Jatrabari Flyover · Construction supervision of three no. interdistrict Bus Terminal. · Construction supervision of 12 no. foot over Bridge. · Maitanance and beautification of Dhakacity Corporation Road. | DTCB | Contract Date: January 14, 1999 Start Date: February, 1999 Completion Date: December, 2004 | 7.59 Million | Mohakhali Flyover. Length: 1011.797 m including ramp (4-Lan PC Box Girder Bridge) Jatrabari Flyover Length: 1810.00 m |
11. | Detailed Architectural & Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Flyover at Bahaddarhat Junction, Chittagong. | CDA | Start Date March 2010 Completion Date September 2013 | Tk. 290.45 Lacs (USD 0.37 million) | Length 1384 m |
Bridge Sector
Sl. No. | Name of Project | Client/ Fund | Period of Execution | Total value of the services (Contract Value) | Size & Type |
1. | Consultancy Services for Detailed Structural Design of Seventy-Five Bridges of more than 100m in Length under Different Locations in Eight Divisions, under Feasibility Study for Important Bridge Construction on Rural Roads Project (2nd Phase). (Package No.: FS/24-25/BSD-1). | LGED GOB | Start Date: June 2025 Completion Date: Ongoing | Tk. 3,98,10,000.00 | The 75 bridge sites are located in 8 Divisions, 22 Districts and 44 Upazilas in the northeast, far and near northwest, southwest and central southeast regions. |
2. | Program for Supporting Rural Bridges (SupRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17-1 | LGED GOB | Start Date: July 2023 Completion Date: Ongoing | Tk. 154.05 Lacs | The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
3. | Program for Supporting Rural Bridges (SupRB): Consultant for Region (Survey & Supervision Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 18-1 | LGED GOB | Start Date: July 2023 Completion Date: Ongoing | Tk. 129.36 Lacs | The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
4. | Program for Supporting Rural Bridges (SupRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensingh Division). Proposal Package No: SupRB/2018-19/SD 26-1 | LGED GOB | Start Date: July 2023 Completion Date: Ongoing | Tk. 344.29 Lacs. | The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
5. | Consultancy Services for Detailed Design, Tender Assistance and Project Implementation of Construction of Nalua-Baherchar Bridge over the river Pandab-Paira at 27th km of Barishal (Dinerarpool)-Laxmipasha-Dumki Road (Z-8044). | RHD GOB | Start Date: June 2023 Completion Date: Ongoing | BDT 7,274.60 Lacs US$ 6.705 Million | Length of Bridge: 1300.00M Detailed Design, Tender Assistance and Project Implementation |
6. | Consultancy Services for Bridge/Culvert Inspection and Data Entry Operation with the Help of Existing Manuals and BMS Software under Barisal Zone and Khulna Zone of Roads and Highways Department (Proposal Package No: SPDC/S/04/2021-2022) | RHD | Start Date: October 2023 Completion Date: Ongoing | BDT 107180000.00 | approximately 1125nos. bridges and 4955nos. Culverts. |
7. | Construction Supervision of Construction of Sonahat Bridge over the River Dudhkumar at Bhurungamari – Sonahat Landport Mothergonj-Bhitorbondh-Nageshwari Road. | RHD | Start Date: September 2019 Completion Date: September 2023 | Tk. 362.75 Lacs | The Project Covering (i) 645.015m PC Girder Bridge including 2.32 km approach Road and an office building cum inspection banglow. |
8. | Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Sylhet Division). Proposal Package No: SupRB/2018-19/SD 17 | LGED | Start Date: October 2019 Completion Date: March 2023 | Tk. 286.47 Lacs. | The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
9. | Program for Supporting Rural Bridges (SurRB): Consultant for Region (Survey & Supervision Consultant) (Mymensinghh Division). Proposal Package No: SupRB/2018-19/SD 18 | LGED | Start Date: August 2019 Completion Date: July 2023 | Tk. 255.62 Lacs | The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
10. | Program for Supporting Rural Bridges (SurRB): Consultant for Field (Supervision & Monitoring Consultant) (Mymensinghh Division). Proposal Package No: SupRB/2018-19/SD 26 | LGED | Start Date: October 2019 Completion Date: November 2022 | Tk. 544.72 Lacs. | The program Components include Major and minor maintenance of 85,000 meters of bridges, rehabilitation of 24,000 meters of bridges, Capacity Expansion (Widened) of 5000 meters of rural bridges, replacement or newly construction of 20,000 meters of bridges |
11. | Design Review, Tender Documentation and Construction Supervision for Construction of Shitalakhya Bridge (1234.50m) Project (3rd Shitalakhya Bridge Construction Project at Bandar Upazilla, Narayanganj), And 72 Km Road, Bangladesh (Saudi Development Fund) | RHD | Contract Date: February 2014 Start Date: March 2014 Completion Date: July 2023 | Tk. 2.2 million | 1234.50m (Box Girder Bridge) |
12. | Construction of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women). Construction Supervision Phase | CDA | Start Date: June 2015 Completion Date: May 2017 | Tk. 376.337 Lacs | Length: (30X 5) m (PSC) (40X 1) m (PSC) (24X 1) m (RCC) (425.55X 1) m (PSC) |
13. | Consulting services for Strengthen of Link Road from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. | CDA | Start Date: 25/11/2010 Completion Date: 24/02/2012 | Tk 230.00 Lacs | Length: (42X 2) m (PSC) (12X 1) m (RCC) (22X 1) m (RCC) (20X 1) m (RCC) |
14. | Techno Economic Feasibility Study, Digital Topographical Survey, Sub-soil Investigation, Detailed Engineering Design, Cost Estimate and Bill of Quantities (BOQ) for Construction of RCC Bridge on Achintapur UP H/Q – Bhalukapur Bazar Road (Road ID 361233025) at Chainage 3800m over Jalburunga River under Gouripur Upazila, Dist.-Mymensinghh. | LGED | Start Date: 06-Mar-2017 Completion Date: 05-Apr-2017 | Tk. 2.35 Million | Length: 120m Long RCC Bridge |
15. | Sub-Soil Investigation & Digital Topographical Survey, Detail Design, Drawing (Draft & Final) and Cost Estimate for 40 (Forty) Bridges with Provision for Hydro-Morphological Study 01 (One) Bridge. | LGED | Contract Date: February 2016 Start Date: March 2016 Completion Date: December 2016 | Tk. 3.57 Million | 40 number Bridge. Length Varies from 15 m to 75 m |
16. | Preparation of Detail Structural Design, Estimate, Technical specification and Standard Tender Document of 02 (Two) bridges under Manikgonj District. | LGED | Contract Date: October 2013 Start Date: October 2013 Completion Date: December 2013 | Tk. 4.499 Million | Length: (315X 1) m (PSC) 9 Spans, Span length 35 m Each) (297X 1) m (PSC) of 9 Spans, Span length 33 m Each) |
17. | Detailed Structural Design, Estimate, Technical specification and Standard Tender Document of 03 (Three) Bridges under Naogaon & Manikgonj District. | LGED | Contract Date: March 2013 Start Date: March 05, 2013 Completion Date: June 05, 2013 | Tk. 53.995 Lac | Length: (217X 1) m (PSC) 7 Spans, Span length 31 m Each) (125X 1) m (RCC) 5 Span, Span length 25 m Each) (297X 1) m (PSC) 9 Span, Span length 33 m Each) |
18. | Construction of Two Bridges (560 m each) on Brammaputra River Under Islampur Upazila of Jamalpur District. | LGED | Contract Date: June 08, 2011 Design Phase: Start Date: June 2011 Completion Date: August 2011 | 0.053 Million (Tk. 3.95 Million) | Length: (560 X 1) m PC Girder 16 Span, Span length 35 m Each) (560 X 1) m PC Girder 16 Span, Span length 35 m Each) |
19. | Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road [21 km (approx.) of the R203 road.] and Bridges & Culverts under Brahmanbaria Road Division. | RHD | Start Date: August 2015 Completion Date: March 2016 | Tk. 4.505 Million | Length: (30X 5) m (PSC) (40X 1) m (PSC) (24X 1) m (RCC) (425.55X 1) m (PSC) |
20. | Economic Analysis of Proposed 05 (Five) nos. Bridges over Different 05 (Five) Rivers on Netrakona District. | LGED | Start Date: Mar. 12, 2013 Completion Date: May 11, 2013 | Tk. 13.29 Lac. | Length: 224×1 m (PSC) 150×1 m (RCC) 110×1 m (RCC) 125×1 m (RCC) 110×1 m (RCC) |
21. | Economic Analysis of Proposed 04 (Four) nos. bridges over different 04 (Four) rivers on Jamalpur District. | LGED | Start Date: Feb. 03, 2013 Completion Date: Apr. 03, 2013 | Tk. 10.52 Lac | 210×1 m (RCC) 585×1 m (PSC) 125×1 m (RCC) 90×1 m (RCC) |
22. | Consulting services Feasibility Study and Preliminary Design for a) construction of Bridge at Ferry Location at 70th Km on Labukhali – Dumki – Boga – Dashmina – Golachipa – Amragachi Road (Z8806); (Length: 1600 m) (b) construction of Bridge at Ferry Location at 53rd Km on Barishal – Jhalokhati – Bhandaria – Perojpur Road (R870) over the river Kocha; (Length: 2000 m) and (c) Construction of Bridge at Ferry Location at 8th Km. on Rahmatpur – Babugonj – Muladia – Hizlakok Road (Z8034) under BBA” (Length: 1800 m) under Bangladesh Bridge Authority. | BBA | Start Date (Month/year): June 2011 Completion Date (month/year): February 2012 | Tk. 204.5 Lacs | Length: 1600×1 m (Segmental Box Girder) 2000 x1 m (Segmental Box Girder) 1800 x1 m (Segmental Box Girder) |
23. | Feasibility Study for Construction of Bridge at Ferry Location at 17th Km on Kachua – Betagi – Patuakhali – Lohalia – Kalaya Road (Z8052) | BBA | Start Date (month/year): September 2011 Completion Date (month/year): March 2012 | Tk. 98.65 Lacs | Length: 1750×1 m (Segmental Box Girder) |
24. | Sylhet-Tamabil-Jaflong Road Improvement Project. [Hazrat Shah Paran (2nd Surma) Bridge & Other Drainage Structures] | RHD | Start Date: July 2002 Completion Date: January 2006 | 0.45 Million | Length: 392 m PC Girder |
25. | Design, Supervision & Monitoring of Madani Avenue Road Project (form Progoti Sarani Intersection to Balu River) Phase – I: Design Phase Phase – II: Construction Supervision Phase | RAJUK | Contract Date: June 05, 2011 Phase – I Start Date: 5/6/2011 Completion Date: 30/1/2012 Phase – II Start Date: 1/3/2012 Completion Date: March 2014 | 133.00 Lacs | Length: (30 X 2) m (90 X 1) m (60 X 1) m PC Girder |
26. | Detail Design, Supervision and Monitoring for the Construction of Roads, Bridges / Culverts of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road) | RAJUK | Contract Date: March 12, 2009 Start Date: March 2009 Completion Date: September 2013 | Tk. 184 Lacs (US$ 0.27 Million ) | Approximately length 40 to 50m each |
27. | Detailed Design and Construction Supervision of 7 Nos. of Bridge Construction Work of Purbachal New Town Project. | RAJUK | Contract Date: November 25, 2009 Start Date: November 2009 Completion Date: February, 2011 | 0.092 Million | 7 nos. of Bridges, Approximate length 40 to 50m each |
28. | Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. | BD Army | Start Date: April 2014 Completion Date: March 2017 | Tk. 189.00 Lacs | Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. |
29. | IDA financed Rehabilitation of Dhaka-Sylhet Road | RHD | Contract Date: May 14, 1999 Start Date June 1999 Completion Date December 2004 | 5.90 Million | Length: 37 Nos. P.C. Girder Bridges, approximately 1295 m in length |
30. | JBIC funded Supervision of Paksey Bridge Construction Project | RHD | Start Date June 1998 Completion Date April 2004 | 5.25 Million | 1786m, consisting of 15 spans each 109.5m long, plus two shorter end spans each 71.75 meter long. |
31. | Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Construction of Andkoy – Aquina Road | MPW | Start Date: Jul 2007 Completion Date: April 2013 | USD 1.24 million (BDT 104.16 million) | Approximate length 40 to 50 m each |
32. | Detailed Engineering Design (DED), Project Management and Supervision Consulting services for Rehabilitation of Doshi-Pol-E Khumri existing Road, | MPW | Start Date: Jul 2007 Completion Date: October 2014 | USD 1.411 million (BDT 118.524 million) | Approximate length 40 to 50 m each |
33. | Supervision Consultancy Service of Jabul Saraj-Nijrab Road Project MPW/869/ ABD/QCBS | MPW | Start Date: November 2010 Completion Date: July 2018 | USD 2.184 million (BDT 183.456 million) | Approximate length 40 to 50 m each |
34. | Supervision Consultancy for construction supervision of Fayzabad – Eshkashim (43 km) (Fayzabad-Beharak) Road Project MPW/870/ ABD/QCB | MPW | Start Date: Mar 2012 Completion Date: July 2018 | USD 4.144 million (BDT 348.096 million) | Approximate length 40 to 50 m each |
- Preparation of Detail Architectural & Structural Design, Drawing, Cost Estimate, Bid Document & Permanent Supervision for Construction of Elevated Expressway from Lalkhan Bazar to Sha-Amanat Airport in Chittagong City. Client- CDA,
- 04 (Four) Lane Overpass under the project of “Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised)”
- Construction Supervision of Construction of Sonahat Bridge over the River Dudhkumar at Bhurungamari – Sonahat Landport Mothergonj- Bhitorbondh-Nageshwari Road.
- Preparation of Detailed Architectural & Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Akhtaruzzaman Chowdhury Flyover at Bahaddarhat Junction, Chittagong.
- Techno Economic Feasibility Study, Digital Topographical Survey, Sub-soil Investigation, Detailed Engineering Design, Cost Estimate and Bill of Quantities (BOQ) for Construction of RCC 3800m Bridge on Jalburunga River at Achintapur under Gouripur Upazila, Dist.-Mymensingh.
- Sub-Soil Investigation & Digital Topographical Survey, Detail Design, Drawing (Draft & Final) and Cost Estimate for 40 (Forty) Bridges with Provision for Hydro-Morphological Study 01 (One) Bridge
- Design Review, Tender Documentation and Construction Supervision for Construction of Shitalakhya Bridge (1290 m) Project (3rd Shitalakhya Bridge Construction Project at Bandar Upazilla, Narayanganj), And 72 Km Road, Bangladesh (Saudi Development Fund)
- Consultancy services for an Overpass under the Project of “Construction of Connecting Road from Natore Road (RUET) to Rajshahi by-pass Road”.
- GOB Funded Construction of Flyover at Muradpur, 2 no. Gate & GEC Junction, Chittagong
- Supervision of Construction work of Kadamtali Junction Flyover, Chittagong.
- Consultancy Services for Construction of Flyover Bridges in Dhaka [Construction Moghbazar – Mouchak (combined) Flyover], 2014.
- Preparation of Detail Structural Design, Estimate, Technical specification and Standard Tender Document of 02(Two) bridges under Manikgonj District.
- Economic Analysis of Important 05 (Five) Large Bridges on Netrakona District.
- Feasibility Study of 04 nos Large Bridges in Jamalpur District.
- Soil test, Design & Supervision of “Construction of two Bridges (Each of 560 m) on Brammaputra river under Islampur Upazila of Jamalpur District.”
- Consultancy Services for Detail Structural Design of a) Const of 217 m. Long Bridge on Nilkuthi-Gotgari hat-Joth Bazar-Damnash GC (Bagmara) road at Ch. 3980.00 m over Atrai river. (ID No. 164472014), b) Const of 125 m. Long Bridge on Hazi Gobindapur R&H Cheragpur-Bottoli GC (Niamotpur) road at Ch. 5200.00m over Shibo River. (ID No. 164472009), c) Const of 297 m. Long Bridge on over the river Kaliganga at Bethua in Manikgonj Sadar Pourashava.
- Consultancy Services Feasibility Study and Preliminary Design for a) construction of Bridge at Ferry Location at 70th Km on Labukhali – Dumki – Boga – Dashmina – Golachipa – Amragachi Road (Z8806); (Length: 1600 m) (b) construction of Bridge at Ferry Location at 53rd Km on Barishal – Jhalokhati – Bhandaria – Perojpur Road (R870) over the river Kocha; (Length: 2000 m) and (c) Construction of Bridge at Ferry Location at 8th Km. on Rahmatpur – Babugonj – Muladia – Hizlakok Road (Z8034) under BBA” (Length: 1800 m) under Bangladesh Bridge Authority.
- Construction supervision of 864.21 m length of Mohakhali Flyover under Dhaka Urban Transport Project (DUTP), Dhaka Transport Co-ordination Board (DTCB) (IDA financed)
- Detailed Design for Railway Overpass and Road Connecting between Bijoy Sharani and Tejgaon Industrial Area, Dhaka of Rajdhani Unnayan Kartripakkha (RAJUK).
Railways
In the Railway Development Sector, SARM has been associated with Bangladesh Railway for planning and design of construction works since 1979-80. Major projects in the Railway sector are:
Sl. No. | Project Name | Funding by | Client | Period of Execution |
1. | Consulting Services for Railway Connectivity Improvement Preparatory Facility Project [Package No. CS3 (RCIPFSD1)] | ODA | Bangladesh Railway | Start Date: February 2023 Completion Date: Ongoing |
2. | Consultancy Services for the Impact Evaluation of “Construction of a New Railway Line from Ishurdi to Dhalarchar via Pabna (2nd Revised)”, Under Contract Package No: SR -4/Sector-2 (B). 2024, | GOB. | IMED | November 2024 to May 2025 |
3. | Consulting services for In-depth Monitoring of Rehabilitation of Kalukhali-Bhatiapara Section and Construction of Kashiani-Gopalganj-Tungipara New Rail Line Project. | GOB. | Implementation Monitoring and Evaluation Division (IMED). | Start Date: February 2018 Completion Date: June 2018 |
4. | Detailed Engineering Design and Construction Supervision for Railway Overpass and Road connecting between Bijoy Sarani and Tejgaon Industrial Area. 2008 to 2010, | GOB. | RAJUK | 2008 to 2010 |
5. |
| GOB | Bangladesh Army | Start Date: August 2018 to 2025 |
6. | Consulting Services for Feasibility Study for Conversion/Construction of Dhaka – Chittagong Railway Line into Double Track with Electric Traction. | GOB | Bangladesh Railway | Start Date: May 2008 Completion Date: October 2010 |
Environment & Social Impact Assessment
Sl. No.
Project Name
Month & Year
Client
Funding Agency
1.
Khulna by-pass Road under Rupsa Bridge Construction Project
RHD,
March, 2000
JICA/GOB
2.
Sylhet Tamabil- Jaflong Road Improvement Project ( Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road including Hazrat Shah Paran Bridge over River Surma and other Drainage Structure
RHD,
2002
KFAED
3.
Construction Supervision for Rehabilitation of Dhaka Sylhet Road
RHD
IDA
4.
Dhaka Urban Transport Project (DUTP)
Dhaka Transport Co-ordination Board
IDA
5.
Pakshi Bridge Construction Project
RHD
JBIC
6.
Basic Study on the Present situation of the Previous Grant Aid Project for the Bridges in Bangladesh
Japan International Co-operative Agency (JICA)
JICA
7.
Resettlement Plan for Project Affected People (PAPs) of the by-pass and realignment under Second Road Rehabilitation and Implementation Projecy
RHD
IDA
8.
Socio- Econimic- Survey of the Project Affected Families (PAPs) of the By-pass and Re-alignment under RRMPII.
RHD
IDA
9.
Construction Supervision of Bridges and Culverts under FFW Structure Programme ( 1990-93) in Zone VI Rajshahi Division
Relief & Rehabilitation Directorate
GOB
10.
Studies under Fourth Flood Control & Drainage Project (FCD- IV) ALA/87-2
Bangladesh Water Development board
GOB
11.
Benchmark Survey for Flood Control & Drainage III Project in Comilla, Jessore and Naogaon Area
Bangladesh Water Development board
GOB
12.
Evaluation Studies of Karnafuli Irrigation Project
Bangladesh Water Development board
GOB
13.
Preparation of Master Plan for Nilphamari Municipla Area
Local Govt. Engineering Bereau
GOB
14.
Land use Plan for Netrokona Zila Shahar
UDD
GOB
15.
Land use plan for madan and mohangonj Upazila Shahar
UDD
GOB
16.
Urban Area development and environmental Improvement Project
UDD
GOB
17.
Land use plan for Gaibandha Zila Shahar
UDD
GOB
18.
Land use Plan for 3 Upazila Shahar ( Saghata, Fulchari & Rajibpur)
UDD
GOB
19.
Preparation of development plans for Keranigonj Area Dhaka
UDD
GOB
20.
Upazila Land use/ Master Plan for 5 Upazilas of Jessore District.
UDD
GOB