Rajshahi Airport Road to By-Pass and Kapasia to Sucharan Mor Feasibility Study
Feasibility Study for Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road (1.10 km, Width 18.28m) and Kapasia Bazar to Sucharan Mor (2.35 km, Width 24.38m). Services include traffic survey, demand forecasting, preliminary engineering design, social and environmental impact assessment and economic evaluation. Funded by GOB.
Chittagong Elevated Expressway – Lalkhan Bazar to Shah Amanat Airport Design and Supervision
Consultancy service for Preparation of detailed Architectural and Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Elevated Expressway at Chittagong from Lalkhan Bazar to Shah Amanat Airport. 18 km long, 4-lane divided carriageway with 24 entry/exit ramps/loops at 9 junctions. Phase I: Design and Contractor Selection; Phase II: Supervision. Funded by GOB.
Feni Bypass Road Pavement Strengthening Supervision (IDA Credit 1301-BD)
Supervision of Strengthening of Pavement Work of Feni Bypass Road (IDA Credit No. 1301-BD). Services include inspection of contractor works, drawing interpretation, measurements, payment certification, day-to-day site supervision, quality control by field and laboratory tests, progress monitoring and issuance of completion certificate. Funded by IDA and GOB.
4-Lane Overpass – Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised)

Consultancy Services for a 4-Lane Overpass under Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised). Length and Type: 642m 4-Lane PC Girder. Services include detailed architectural drawing, detailed structural design, sub-soil investigation, topographic survey, contractor supervision and quality assurance. Funded by GOB.
NW Road Rehabilitation and Maintenance Project – Package 1 & 2 (RRMP/IDA)
Road Rehabilitation and Maintenance Project (NW) Package 1 and 2. Services include design and supervision of construction works, maintenance, preparation of drawings and contract documents, day-to-day supervision, quality control, payment certification, progress reporting, and technology transfer and training for RHD personnel. Funded by IDA and GOB.
Railway Overpass (643m) – Natore Road (RUET) to Rajshahi By-Pass Connecting Road
Consultancy services for a Railway Overpass under the Project Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road. Length and Type: 643m 2-Lane PSC Girder. Services include detailed engineering design, topographic survey, utility survey, design criteria, soil investigation, alignment fixation, detail design and cost estimate preparation. Funded by GOB.
Sylhet–Tamabil–Jaflong Road (N2) to 4-Lane – Design Review Enhancement (AIIB)

Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-Lane Highway with Service Lane on both sides. 33 bridges totalling 2,221m including three major bridges: 411.04m PC Girder, 106.68m RC Girder and 197.87m PC Girder. Funded by Asian Infrastructure Investment Bank (AIIB).
75 Long-Span Rural Bridges Structural Design – 8 Divisions (LGED 2nd Phase)
Consultancy Services for Detailed Structural Design of 75 Bridges (100m+ each) in Different Locations across 8 Divisions, 22 Districts and 44 Upazilas under Feasibility Study for Important Bridge Construction on Rural Roads Project (2nd Phase), Package FS/24-25/BSD-1. Services include site investigation, structural system options, detailed design, tender documents and final approval. Funded by GOB.
Moghbazar–Mouchak Combined Flyover (8 km) – Dhaka Construction Supervision (KFAED)

Construction of Flyover Bridges in Dhaka – Moghbazar–Mouchak (Combined) Flyover Project. Length: 8 km (8,000m). Services include site survey, sub-soil investigation, review of architectural drawings, review of structural design and working drawings, preparation of cost estimate, specification, bid document and full-time supervision, quality control and management of construction works. Funded by Kuwait Fund for Arab Economic Development (KFAED).
Rajapara–Payra Port 4-Lane Connection Road Supervision
Design Review, Supervision and Management for Construction of 4-Lane Rajapara-Payra Port Connection Road, Payra Port, Bangladesh. Supervision of RCC Road, Bridge/Culvert and related structures to PPA standards. Services include sub-soil investigation review, road and structural design review, construction supervision, project management and contract administration. Funded by GOB.