4 Flyovers at Railway Crossings – Rajshahi City Design and Supervision (RCC)
Prepare Detail Design, Drawing and Construction Supervision for 4 Flyovers at different Railway Crossings under Integrated Urban Infrastructure Development in Rajshahi City (Package SW-02, Lot-B). Flyovers: (a) 400m at Horogram Notunpara, (b) 521m at Rajshahi Court Station, (c) 897m at Shahid A.H.M Kamaruzzaman Chottor, (d) 520m at Vodra Railway Crossing. Phase 1: Design (6 months); Phase 2: Construction Supervision (36 months). Funded by GOB.
Integrated Flyover (1,255m) at Bornali, Bondho Gate and Bilsimla – Rajshahi (RCC)
Prepare Detail Design, Drawing and Construction Supervision for Integrated 1,255m Flyover at Bornali, Bondho Gate and New Bilsimla Railway Crossing along recently completed 4-lane Road under Integrated Urban Infrastructure Development in Rajshahi City (Lot-C). Phase 1: Design (6 months); Phase 2: Construction Supervision (36 months). Funded by GOB.
Chittagong Elevated Expressway – Lalkhan Bazar to Shah Amanat Airport Design and Supervision
Consultancy service for Preparation of detailed Architectural and Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Elevated Expressway at Chittagong from Lalkhan Bazar to Shah Amanat Airport. 18 km long, 4-lane divided carriageway with 24 entry/exit ramps/loops at 9 junctions. Phase I: Design and Contractor Selection; Phase II: Supervision. Funded by GOB.
4-Lane Overpass – Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised)

Consultancy Services for a 4-Lane Overpass under Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised). Length and Type: 642m 4-Lane PC Girder. Services include detailed architectural drawing, detailed structural design, sub-soil investigation, topographic survey, contractor supervision and quality assurance. Funded by GOB.
Railway Overpass (643m) – Natore Road (RUET) to Rajshahi By-Pass Connecting Road
Consultancy services for a Railway Overpass under the Project Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road. Length and Type: 643m 2-Lane PSC Girder. Services include detailed engineering design, topographic survey, utility survey, design criteria, soil investigation, alignment fixation, detail design and cost estimate preparation. Funded by GOB.
Moghbazar–Mouchak Combined Flyover (8 km) – Dhaka Construction Supervision (KFAED)

Construction of Flyover Bridges in Dhaka – Moghbazar–Mouchak (Combined) Flyover Project. Length: 8 km (8,000m). Services include site survey, sub-soil investigation, review of architectural drawings, review of structural design and working drawings, preparation of cost estimate, specification, bid document and full-time supervision, quality control and management of construction works. Funded by Kuwait Fund for Arab Economic Development (KFAED).
Kadamtoli Junction Flyover (645m) – Chittagong Construction Supervision (CDA)

Supervision of Construction of Kadamtoli Junction Flyover (Railway Overpass), Chittagong. Length and Type: 645m PC Girder. Services include site survey, sub-soil investigation, review of architectural and structural drawings, cost estimate, bid document and full-time supervision, quality control and management of construction works. Funded by GOB.
Muradpur Flyover (5.2 km) and 2 Gate Junctions – Chittagong Design and Supervision
Prefeasibility Study, Feasibility Study, Detailed Design and Construction Supervision of Flyover at Muradpur, 2 Gate Junctions and GEC Junction, Chittagong. Length: 5.2 km (5,200m). Services include site survey, sub-soil investigation, preparation of detail architectural drawing, structural design and working drawings, cost estimate, specification, bid document and full-time supervision with quality control. Funded by GOB.
Mohakhali Flyover and Jatrabari Flyover Design and Supervision – Dhaka (DUTP/World Bank)

Dhaka Urban Transport Project (DUTP): Design review and construction supervision of Mohakhali Flyover (1,011.797m, 4-Lane PC Box Girder); feasibility study of Jatrabari Flyover (1,810m); construction supervision of 3 interdistrict bus terminals and 12 foot over bridges; maintenance and beautification of Dhaka City Corporation roads. Funded by World Bank.
Railway Overpass – Bijoy Sarani to Tejgaon Industrial Area, Dhaka (RAJUK)

Detailed Engineering Design and Construction Supervision for Railway Overpass and Road connecting Bijoy Sarani and Tejgaon Industrial Area. Length and Type: 669m 4-Lane PC Girder. Services include topographic survey, sub-soil investigation, classified traffic count, detailed structural design of bored pile, pier, pre-stressed girder and deck slab, pavement design, overpass and outdoor lighting, tender documents and full-time supervision. Funded by GOB.