Madani Avenue Road – Progoti Sarani to Balu River Design and Supervision

Design, Supervision and Monitoring of Madani Avenue Road Project (Progoti Sarani Intersection to Balu River). Phase I: Detailed planning, engineering design, traffic survey and forecast, topographic survey, soil investigation and tender documents. Phase II: 15-month construction supervision and quality control. Funded by GOB.

Two Bridges (560m each) on Brahmaputra River – Islampur, Jamalpur (LGED)

Detailed Design and Construction Supervision of Two Bridges (560m each) on Brahmaputra River under Islampur Upazila, Jamalpur District. Type: PC Girder Bridges. Services include topographic survey, land acquisition plan, sub-soil investigation, structural design, BOQ, specifications, tender documents and construction supervision. Funded by GOB.

4 Flyovers at Railway Crossings – Rajshahi City Design and Supervision (RCC)

Prepare Detail Design, Drawing and Construction Supervision for 4 Flyovers at different Railway Crossings under Integrated Urban Infrastructure Development in Rajshahi City (Package SW-02, Lot-B). Flyovers: (a) 400m at Horogram Notunpara, (b) 521m at Rajshahi Court Station, (c) 897m at Shahid A.H.M Kamaruzzaman Chottor, (d) 520m at Vodra Railway Crossing. Phase 1: Design (6 months); Phase 2: Construction Supervision (36 months). Funded by GOB.

Dhaka–Sylhet Road IDA-Financed Rehabilitation

IDA-financed Rehabilitation of Dhaka-Sylhet Road covering 301 structures including 37 PC Girder Bridges, 347 Box Culverts and 2 Railway Overpasses across 6 contracts in two phases. Services include design review, tender evaluation, resettlement monitoring, supervision and technology transfer. Total project cost: approximately $170.86 million. Funded by IDA.

Integrated Flyover (1,255m) at Bornali, Bondho Gate and Bilsimla – Rajshahi (RCC)

Prepare Detail Design, Drawing and Construction Supervision for Integrated 1,255m Flyover at Bornali, Bondho Gate and New Bilsimla Railway Crossing along recently completed 4-lane Road under Integrated Urban Infrastructure Development in Rajshahi City (Lot-C). Phase 1: Design (6 months); Phase 2: Construction Supervision (36 months). Funded by GOB.

Andkoy–Aquina Road DED and Supervision – Afghanistan (IDB)

Detailed Engineering Design, Project Management and Supervision for Construction of Andkoy-Aquina Road. Phase I: Survey, investigation, detailed design and tender documents. Phase II: Full-time supervision with quality and cost control. PSC Bridges of 40 to 50m each. Funded by Islamic Development Bank (IDB).

Chittagong Elevated Expressway – Lalkhan Bazar to Shah Amanat Airport Design and Supervision

Consultancy service for Preparation of detailed Architectural and Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Elevated Expressway at Chittagong from Lalkhan Bazar to Shah Amanat Airport. 18 km long, 4-lane divided carriageway with 24 entry/exit ramps/loops at 9 junctions. Phase I: Design and Contractor Selection; Phase II: Supervision. Funded by GOB.

Doshi–Pol E Khomri Road Rehabilitation – Afghanistan (IDB)

DED, Project Management and Supervision for Rehabilitation of Doshi-Pol E Khomri Road. 55 km: 15 km 4-lane and 40 km 2-lane, with 6 prestressed girder bridges and 55 RCC box culverts. Phase I: Design; Phase II: Full-time supervision. Funded by IDB.

4-Lane Overpass – Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised)

Consultancy Services for a 4-Lane Overpass under Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised). Length and Type: 642m 4-Lane PC Girder. Services include detailed architectural drawing, detailed structural design, sub-soil investigation, topographic survey, contractor supervision and quality assurance. Funded by GOB.