Integrated Flyover (1,255m) at Bornali, Bondho Gate and Bilsimla – Rajshahi (RCC)

Prepare Detail Design, Drawing and Construction Supervision for Integrated 1,255m Flyover at Bornali, Bondho Gate and New Bilsimla Railway Crossing along recently completed 4-lane Road under Integrated Urban Infrastructure Development in Rajshahi City (Lot-C). Phase 1: Design (6 months); Phase 2: Construction Supervision (36 months). Funded by GOB.

Andkoy–Aquina Road DED and Supervision – Afghanistan (IDB)

Detailed Engineering Design, Project Management and Supervision for Construction of Andkoy-Aquina Road. Phase I: Survey, investigation, detailed design and tender documents. Phase II: Full-time supervision with quality and cost control. PSC Bridges of 40 to 50m each. Funded by Islamic Development Bank (IDB).

Chittagong Elevated Expressway – Lalkhan Bazar to Shah Amanat Airport Design and Supervision

Consultancy service for Preparation of detailed Architectural and Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Elevated Expressway at Chittagong from Lalkhan Bazar to Shah Amanat Airport. 18 km long, 4-lane divided carriageway with 24 entry/exit ramps/loops at 9 junctions. Phase I: Design and Contractor Selection; Phase II: Supervision. Funded by GOB.

Doshi–Pol E Khomri Road Rehabilitation – Afghanistan (IDB)

DED, Project Management and Supervision for Rehabilitation of Doshi-Pol E Khomri Road. 55 km: 15 km 4-lane and 40 km 2-lane, with 6 prestressed girder bridges and 55 RCC box culverts. Phase I: Design; Phase II: Full-time supervision. Funded by IDB.

4-Lane Overpass – Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised)

Consultancy Services for a 4-Lane Overpass under Construction of Connecting Road from Natore Road (RUET) to Rajshahi By-Pass Road (1st Revised). Length and Type: 642m 4-Lane PC Girder. Services include detailed architectural drawing, detailed structural design, sub-soil investigation, topographic survey, contractor supervision and quality assurance. Funded by GOB.

Moghbazar–Mouchak Combined Flyover (8 km) – Dhaka Construction Supervision (KFAED)

Construction of Flyover Bridges in Dhaka – Moghbazar–Mouchak (Combined) Flyover Project. Length: 8 km (8,000m). Services include site survey, sub-soil investigation, review of architectural drawings, review of structural design and working drawings, preparation of cost estimate, specification, bid document and full-time supervision, quality control and management of construction works. Funded by Kuwait Fund for Arab Economic Development (KFAED).

Kadamtoli Junction Flyover (645m) – Chittagong Construction Supervision (CDA)

Supervision of Construction of Kadamtoli Junction Flyover (Railway Overpass), Chittagong. Length and Type: 645m PC Girder. Services include site survey, sub-soil investigation, review of architectural and structural drawings, cost estimate, bid document and full-time supervision, quality control and management of construction works. Funded by GOB.

Khulna By-pass Road under Rupsa Bridge – Design and Supervision (RHD)

Survey, Investigation, Detailed Design, Pre-construction Services and Construction Supervision for Khulna By-pass Road under the Rupsa Bridge Construction Project. Services include alignment fixing, topographic survey, soil investigation, bridge design, tender documents, contractor pre-qualification, full construction supervision, payment certification, environmental and resettlement management and maintenance supervision during Defects Liability Period. Funded by GOB.