75 Long-Span Rural Bridges Structural Design – 8 Divisions (LGED 2nd Phase)

Consultancy Services for Detailed Structural Design of 75 Bridges (100m+ each) in Different Locations across 8 Divisions, 22 Districts and 44 Upazilas under Feasibility Study for Important Bridge Construction on Rural Roads Project (2nd Phase), Package FS/24-25/BSD-1. Services include site investigation, structural system options, detailed design, tender documents and final approval. Funded by GOB.

Nalua–Baherchar Bridge over Pandab-Paira River – Detailed Design (RHD/OFID)

Detailed Design, Tender Assistance and Project Implementation for Nalua-Baherchar Bridge over the river Pandab-Paira at 27th km of Barishal (Dinerarpool)-Laxmipasha-Dumki Road (Z-8044). Services include reconnaissance and topographic survey, traffic observation, geophysical and soil investigations, hydrological review, preliminary and final engineering design, quality assurance plan, EMP, land acquisition and resettlement plan and O&M support. Funded by GOB and OPEC Fund for International Development (OFID Loan 14212P).

Two Bridges (560m each) on Brahmaputra River – Islampur, Jamalpur (LGED)

Detailed Design and Construction Supervision of Two Bridges (560m each) on Brahmaputra River under Islampur Upazila, Jamalpur District. Type: PC Girder Bridges. Services include topographic survey, land acquisition plan, sub-soil investigation, structural design, BOQ, specifications, tender documents and construction supervision. Funded by GOB.

2 PSC Girder Bridges Structural Design – Manikgonj District (LGED)

Detail Structural Design, Estimate, Technical Specification and Standard Tender Document for 2 bridges under Manikgonj District. Bridges: 315m PSC Girder and 297m PSC Girder. Services include topographic survey, land acquisition plan, sub-soil investigation, structural design, BOQ, specification and tender documents. Funded by GOB.

3 Bridges Structural Design – Naogaon and Manikgonj Districts (LGED)

Detailed Structural Design, Estimate, Technical Specification and Standard Tender Document for 3 bridges under Naogaon and Manikgonj Districts. Bridges: 217m PC Girder, 125m RCC Girder and 297m PC Girder. Services include topographic survey, land acquisition plan, sub-soil investigation, structural design, BOQ, specification and tender documents. Funded by GOB.

4 Flyovers at Railway Crossings – Rajshahi City Design and Supervision (RCC)

Prepare Detail Design, Drawing and Construction Supervision for 4 Flyovers at different Railway Crossings under Integrated Urban Infrastructure Development in Rajshahi City (Package SW-02, Lot-B). Flyovers: (a) 400m at Horogram Notunpara, (b) 521m at Rajshahi Court Station, (c) 897m at Shahid A.H.M Kamaruzzaman Chottor, (d) 520m at Vodra Railway Crossing. Phase 1: Design (6 months); Phase 2: Construction Supervision (36 months). Funded by GOB.

Integrated Flyover (1,255m) at Bornali, Bondho Gate and Bilsimla – Rajshahi (RCC)

Prepare Detail Design, Drawing and Construction Supervision for Integrated 1,255m Flyover at Bornali, Bondho Gate and New Bilsimla Railway Crossing along recently completed 4-lane Road under Integrated Urban Infrastructure Development in Rajshahi City (Lot-C). Phase 1: Design (6 months); Phase 2: Construction Supervision (36 months). Funded by GOB.

AUW 4-Lane Link Road, Chittagong – Detailed Design (CDA)

Detailed Engineering Design of 4-Lane Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road along AUW, Chittagong. Bridges: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design, BOQ and tender documents. Funded by GOB.

Chittagong Elevated Expressway – Lalkhan Bazar to Shah Amanat Airport Design and Supervision

Consultancy service for Preparation of detailed Architectural and Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Elevated Expressway at Chittagong from Lalkhan Bazar to Shah Amanat Airport. 18 km long, 4-lane divided carriageway with 24 entry/exit ramps/loops at 9 junctions. Phase I: Design and Contractor Selection; Phase II: Supervision. Funded by GOB.

Madani Avenue Road – Progoti Sarani to Balu River Design and Supervision

Design, Supervision and Monitoring of Madani Avenue Road Project (Progoti Sarani Intersection to Balu River). Phase I: Detailed planning, engineering design, traffic survey and forecast, topographic survey, soil investigation and tender documents. Phase II: 15-month construction supervision and quality control. Funded by GOB.