NW Road Rehabilitation and Maintenance Project – Package 1 & 2 (RRMP/IDA)

Road Rehabilitation and Maintenance Project (NW) Package 1 and 2. Services include design and supervision of construction works, maintenance, preparation of drawings and contract documents, day-to-day supervision, quality control, payment certification, progress reporting, and technology transfer and training for RHD personnel. Funded by IDA and GOB.

AUW 4-Lane Link Road, Chittagong – Detailed Design (CDA)

Detailed Engineering Design of 4-Lane Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road along AUW, Chittagong. Bridges: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design, BOQ and tender documents. Funded by GOB.

Madani Avenue to Dhaka–Sylhet Highway Feasibility Study (RAJUK)

Feasibility Study including Digital Survey, IEE and EIA for Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B and widening of Major Road 5). Roads: 3.89 km, 5.21 km and 6.15 km (six and eight lanes with service lane). Four underpasses, bridges of 200m and 1,340m. Funded by GOB.

Madani Avenue Road – Progoti Sarani to Balu River Design and Supervision

Design, Supervision and Monitoring of Madani Avenue Road Project (Progoti Sarani Intersection to Balu River). Phase I: Detailed planning, engineering design, traffic survey and forecast, topographic survey, soil investigation and tender documents. Phase II: 15-month construction supervision and quality control. Funded by GOB.

Dhaka–Sylhet Road IDA-Financed Rehabilitation

IDA-financed Rehabilitation of Dhaka-Sylhet Road covering 301 structures including 37 PC Girder Bridges, 347 Box Culverts and 2 Railway Overpasses across 6 contracts in two phases. Services include design review, tender evaluation, resettlement monitoring, supervision and technology transfer. Total project cost: approximately $170.86 million. Funded by IDA.

Andkoy–Aquina Road DED and Supervision – Afghanistan (IDB)

Detailed Engineering Design, Project Management and Supervision for Construction of Andkoy-Aquina Road. Phase I: Survey, investigation, detailed design and tender documents. Phase II: Full-time supervision with quality and cost control. PSC Bridges of 40 to 50m each. Funded by Islamic Development Bank (IDB).

Doshi–Pol E Khomri Road Rehabilitation – Afghanistan (IDB)

DED, Project Management and Supervision for Rehabilitation of Doshi-Pol E Khomri Road. 55 km: 15 km 4-lane and 40 km 2-lane, with 6 prestressed girder bridges and 55 RCC box culverts. Phase I: Design; Phase II: Full-time supervision. Funded by IDB.