Sylhet–Tamabil–Jaflong Road (N2) to 4-Lane – Design Review Enhancement (AIIB)

Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-Lane Highway with Service Lane on both sides. 33 bridges totalling 2,221m including three major bridges: 411.04m PC Girder, 106.68m RC Girder and 197.87m PC Girder. Funded by Asian Infrastructure Investment Bank (AIIB).

Nabinagar–Shibpur–Radhika Road (R203) Feasibility Study and Detailed Design

Feasibility Study and Detailed Design of Nabinagar-Shibpur-Radhika Road (R203) and Bridges and Culverts under Brahmanbaria Road Division. 11 bridges (15–35m) and 22 culverts. Services include traffic survey, geotechnical investigation, EIA, resettlement plan, land acquisition plan and detailed engineering design. Funded by GOB.

Padma Bridge – Janjira & Mawa Approach Roads Construction Supervision

Construction Supervision Consulting Services for (i) Janjira Approach Road and Bridge End Facilities, (ii) Mawa Approach Road and Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads including toll plazas, service areas and offices. Funded by GOB.

Rajshahi Airport Road to By-Pass and Kapasia to Sucharan Mor Feasibility Study

Feasibility Study for Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road (1.10 km, Width 18.28m) and Kapasia Bazar to Sucharan Mor (2.35 km, Width 24.38m). Services include traffic survey, demand forecasting, preliminary engineering design, social and environmental impact assessment and economic evaluation. Funded by GOB.

Madani Avenue to Dhaka–Sylhet Highway Feasibility Study (RAJUK)

Feasibility Study including Digital Survey, IEE and EIA for Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B and widening of Major Road 5). Roads: 3.89 km, 5.21 km and 6.15 km (six and eight lanes with service lane). Four underpasses, bridges of 200m and 1,340m. Funded by GOB.

Feni Bypass Road Pavement Strengthening Supervision (IDA Credit 1301-BD)

Supervision of Strengthening of Pavement Work of Feni Bypass Road (IDA Credit No. 1301-BD). Services include inspection of contractor works, drawing interpretation, measurements, payment certification, day-to-day site supervision, quality control by field and laboratory tests, progress monitoring and issuance of completion certificate. Funded by IDA and GOB.

NW Road Rehabilitation and Maintenance Project – Package 1 & 2 (RRMP/IDA)

Road Rehabilitation and Maintenance Project (NW) Package 1 and 2. Services include design and supervision of construction works, maintenance, preparation of drawings and contract documents, day-to-day supervision, quality control, payment certification, progress reporting, and technology transfer and training for RHD personnel. Funded by IDA and GOB.

Dhaka–Sylhet Road IDA-Financed Rehabilitation

IDA-financed Rehabilitation of Dhaka-Sylhet Road covering 301 structures including 37 PC Girder Bridges, 347 Box Culverts and 2 Railway Overpasses across 6 contracts in two phases. Services include design review, tender evaluation, resettlement monitoring, supervision and technology transfer. Total project cost: approximately $170.86 million. Funded by IDA.

Sylhet Town Bypass with Link to Sylhet–Fenchuganj Road (KFAED)

Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement – Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road. Phase I: Survey, soil investigation, materials investigation, land acquisition plans, engineering design. Phase II: Full-time construction supervision with quality and cost control. Funded by Kuwait Fund for Arab Economic Development (KFAED).