Jabul Saraj–Nijrab Road Design Review and Supervision – Afghanistan (ADB)

Design Review and Supervision Consultancy for Jabul Saraj-Nijrab Road (MPW/869/ABD/QCBS). 50 km road with PSC bridges 40–50m each. Services include design approval, quality certification, FIDIC contract administration, tolling facility supervision and benefit monitoring. Funded by ADB.
Design Review, Supervision and Management Consultant for Construction of 4-Lane Rajapara-Payra Port Connection Road
Design Review, Supervision and Management Consultant for Construction of 4-Lane Rajapara-Payra Port Connection Road, Payra Port, Bangladesh. Length: 5.01 km, Width: 4 Lanes. Funded by Government of Bangladesh (GOB). The work consists of construction supervision of RCC Road, Bridge/Culvert and related structures in accordance with the highest standards of the engineering profession.
Feasibility Study for Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road and Kapasia Bazar to Sucharan Mor, Rajshahi
Feasibility Study for the Project “Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road (Length 1.10 km, Width 18.28m) and Kapasia Bazar to Sucharan Mor (Length 2.35 km, Width 24.38m).” Funded by Government of Bangladesh (GOB). Services include traffic survey and demand forecasting, preliminary engineering design, social and environmental impact assessment, and economic and financial evaluation.
Construction Supervision Consulting Services for Janjira & Mawa Approach Roads and Service Area – Padma Multipurpose Bridge Project

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. Funded by Government of Bangladesh (GOB).
Supervision of Strengthening of Pavement Work of Feni Bypass Road (IDA Credit No. 1301-BD)
Supervision of Strengthening of Pavement Work of Feni Bypass Road (IDA Credit No. 1301-BD). Funded by IDA & Government of Bangladesh (GOB). Services include inspection of contractor works, interpretation of drawings, measurement and payment certification, day-to-day site supervision, quality control by field and laboratory tests, progress monitoring and reporting, and issuance of completion certificate.
Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at AUW – Supervision Phase
Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women). Length of Road: 6.00 km, Width: 14.60m. Bridges include: 425.55m PSC, 40m PSC, 5x30m PSC, 24m RCC. Construction Supervision Phase: 24 months. Funded by Government of Bangladesh (GOB).
Road Rehabilitation and Maintenance Project (NW) – RRMP Package 1 & 2 (IDA Funded)
Road Rehabilitation and Maintenance Project (NW) (RRMP) Package 1 & 2. Funded by IDA & Government of Bangladesh (GOB). Services include design and supervision of construction works and maintenance, preparation of drawings, contract documents, day-to-day supervision, quality control, payment certification, progress reporting, and a key element of technology transfer and training program for RHD personnel.
Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along AUW – Design Phase
Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. Length of Road: 6.00 km, Width: 14.60m. Bridges include: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design and drawings. Funded by Government of Bangladesh (GOB).
Feasibility Study, Detailed Digital Survey, IEE and EIA of Madani Avenue-Barabaraid to Dhaka-Sylhet Highway (Major Road 5A, 5B & 5)

Feasibility Study including Detailed Digital Survey, IEE and EIA of the proposed Project “Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B & widening of Major Road 5). Road lengths: 3.89 km, 5.21 km and 6.15 km (Six and eight lanes with service lane). Four underpasses, one bridge of 200m and another of 1340m (six lanes). Funded by Government of Bangladesh (GOB).
Construction Supervision of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road)
Construction of Purbachal Link Road (Debogram-Progoti Sharani Connecting Road). Length of Road: 7.0 km, Width: 30m. Funded by Government of Bangladesh (GOB). Scope includes construction supervision, quality control, monthly and quarterly progress reports, field surveys and revised design preparation.