Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at AUW – Supervision Phase

Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women). Length of Road: 6.00 km, Width: 14.60m. Bridges include: 425.55m PSC, 40m PSC, 5x30m PSC, 24m RCC. Construction Supervision Phase: 24 months. Funded by Government of Bangladesh (GOB).

Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along AUW – Design Phase

Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. Length of Road: 6.00 km, Width: 14.60m. Bridges include: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design and drawings. Funded by Government of Bangladesh (GOB).

Construction Supervision Consulting Services for Janjira & Mawa Approach Roads and Service Area – Padma Multipurpose Bridge Project

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. Funded by Government of Bangladesh (GOB).

Feasibility Study, Detailed Digital Survey, IEE and EIA of Madani Avenue-Barabaraid to Dhaka-Sylhet Highway (Major Road 5A, 5B & 5)

Feasibility Study including Detailed Digital Survey, IEE and EIA of the proposed Project “Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B & widening of Major Road 5). Road lengths: 3.89 km, 5.21 km and 6.15 km (Six and eight lanes with service lane). Four underpasses, one bridge of 200m and another of 1340m (six lanes). Funded by Government of Bangladesh (GOB).

Design, Supervision & Monitoring of Madani Avenue Road Project (Progoti Sarani Intersection to Balu River) – Phase I & II

Design, Supervision & Monitoring of Madani Avenue Road Project (from Progoti Sarani Intersection to Balu River); Phase I: Design Phase & Phase II: Construction Supervision Phase. Length of Road: 6.18 km, Width: 21.6m & 7.30m. Funded by Government of Bangladesh (GOB). Phase I includes detailed planning, engineering design, traffic survey and forecast, topographic survey, soil investigation, tender documents. Phase II: 15 months construction supervision.