Nalua–Baherchar Bridge over Pandab-Paira River – Detailed Design (RHD/OFID)

Detailed Design, Tender Assistance and Project Implementation for Nalua-Baherchar Bridge over the river Pandab-Paira at 27th km of Barishal (Dinerarpool)-Laxmipasha-Dumki Road (Z-8044). Services include reconnaissance and topographic survey, traffic observation, geophysical and soil investigations, hydrological review, preliminary and final engineering design, quality assurance plan, EMP, land acquisition and resettlement plan and O&M support. Funded by GOB and OPEC Fund for International Development (OFID Loan 14212P).

SupRB Sylhet Division – Rural Bridge Survey and Supervision (LGED)

Program for Supporting Rural Bridges (SupRB) – Survey and Supervision Consultant for Sylhet Division. Package SupRB/2018-19/SD 17-1. Services include engineering surveys, subsoil investigation, engineering design support, asset management system support, environmental and social safeguards monitoring and training program support. Funded by GOB.

Sylhet–Tamabil–Jaflong Road (N2) to 4-Lane – Design Review Enhancement (AIIB)

Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-Lane Highway with Service Lane on both sides. 33 bridges totalling 2,221m including three major bridges: 411.04m PC Girder, 106.68m RC Girder and 197.87m PC Girder. Funded by Asian Infrastructure Investment Bank (AIIB).

SupRB Mymensingh Division – Rural Bridge Survey and Supervision (LGED)

Program for Supporting Rural Bridges (SupRB) – Survey and Supervision Consultant for Mymensingh Division. Package SupRB/2018-19/SD 18-1. Services include engineering surveys, subsoil investigation, engineering design support, asset management system support, environmental and social safeguards monitoring, training program support, gender action plan and grievance redress monitoring. Funded by GOB.

Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision for Widening of Barayerhat-Heanko-Ramgarh Road (R-151 & R-152)

Providing Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision of Construction works for widening the Barayerhat-Heanko-Ramgarh Road (R-151 & R-152) under Chattogram Road Division. Length: 38.00 km widening from 5.50m to 11.30m with construction of 9 bridges and several culverts. Funded by Indian Government (Line of Credit III).

Construction Supervision Consulting Services for Janjira & Mawa Approach Roads and Service Area – Padma Multipurpose Bridge Project

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. Funded by Government of Bangladesh (GOB).

Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at AUW – Supervision Phase

Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women). Length of Road: 6.00 km, Width: 14.60m. Bridges include: 425.55m PSC, 40m PSC, 5x30m PSC, 24m RCC. Construction Supervision Phase: 24 months. Funded by Government of Bangladesh (GOB).

Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along AUW – Design Phase

Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. Length of Road: 6.00 km, Width: 14.60m. Bridges include: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design and drawings. Funded by Government of Bangladesh (GOB).

Feasibility Study, Detailed Digital Survey, IEE and EIA of Madani Avenue-Barabaraid to Dhaka-Sylhet Highway (Major Road 5A, 5B & 5)

Feasibility Study including Detailed Digital Survey, IEE and EIA of the proposed Project “Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B & widening of Major Road 5). Road lengths: 3.89 km, 5.21 km and 6.15 km (Six and eight lanes with service lane). Four underpasses, one bridge of 200m and another of 1340m (six lanes). Funded by Government of Bangladesh (GOB).